没有合适的资源?快使用搜索试试~ 我知道了~
计算机操作员国家职业标准.doc
需积分: 5 0 下载量 149 浏览量
2022-10-16
09:01:33
上传
评论
收藏 150KB DOC 举报
温馨提示
试读
19页
计算机操作员国家职业标准.doc
资源详情
资源评论
资源推荐
计算机操作员国家职业标准
为进一步强化公司安全生产、文明施工管理,切实落实安全生产责任,防止重大安全事故发生,保障企业和员工的生命和财产安全manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. 6.4.4.4 lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. 6.4.4.5 high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the corresponding
计算机操作员国家职业标准
1。 职业概况
1。1 职业名称
计算机操作员
1。2 职业定义
使用电子计算机从事文字、图形、图像等信息处理工作及计算机系统操作、维护与管理的人员。
1.3 职业等级
本职业共设三个等级,分别为:初级(国家职业资格五级)、中级(国家职业资格四级)、高级
(国家职业资格三级)。
1.4 职业环境
室内、常温。
1.5 职业能力特征
眼、手协调,手指、手臂灵活,有一定的文字表达能力,颜色辨别力正常。
1.6 基本文化程度
初中毕业。
1.7 培训要求
1.7。1 培训期限
全日制职业学校教育,根据其培养目标和教学计划确定。晋级培训期限:初级不少于 300 标准
学时;中级不少于 280 标准学时;高级不少于 250 标准学时。
1。7.2 培训教师
培训教师应有本专业工程师(或同等职称)以上专业技术职称,具有一定的计算机操作与应用
实践经验.培训初级、中级人员的教师也可由持高级职业资格证书,并连续从事本职业 2 年以上
者担任.
计算机操作员国家职业标准
为进一步强化公司安全生产、文明施工管理,切实落实安全生产责任,防止重大安全事故发生,保障企业和员工的生命和财产安全manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. 6.4.4.4 lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. 6.4.4.5 high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the corresponding
1.7.3 培训场地设备
理论知识培训在标准教室内,技能操作培训在具有计算机系统及外设等教学设备和软件的实操
教室内.
1。8 鉴定要求
1。8.1 适用对象
从事或准备从事信息处理、计算机系统和网络操作、维护和管理等相关工作的人员。
1。8.2 申报条件
——初级(具备下列条件之一者)
(1)经本职业初级正规培训达规定标准学时数,并取得毕(结)业证书.
(2)在本职业见习工作 2 年以上.
——中级(具备下列条件之一者)
(1)取得计算机操作员初级职业资格证书后,连续从事本职业工作 3 年以上,经本职业中级正
规培训达规定标准学时数,并取得毕(结)业证书。
(2)取得本职业初级职业资格证书后,连续从事本职业工作 5 年以上。
(3)取得经劳动保障行政部门审核认定的、以中级技能为培养目标的中等以上职业学校本专业
毕业证书.
—-高级(具备下列条件之一者)
(1)取得本职业中级职业资格证书后,连续从事本职业工作 4 年以上,经本职业高级正规培训,
达规定标准学时数,并取得毕(结)业证书。
(2)取得本职业中级职业资格证书后,连续从事本职业工作 7 年以上。
(3)取得高级技工学校或经劳动保障行政部门审核认定的、以高级技能为培养目标的高等职业学
校本专业毕业证书。
(4)取得本职业中级职业资格证书的大专以上毕业生,连续从事本职业工作 2 年以上。
计算机操作员国家职业标准
为进一步强化公司安全生产、文明施工管理,切实落实安全生产责任,防止重大安全事故发生,保障企业和员工的生命和财产安全manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. 6.4.4.4 lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. 6.4.4.5 high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the corresponding
1.8.3 鉴定方式
本职业鉴定分为理论知识考试和技能操作考核。技能操作考核采用考场上机实际操作方式,由
3~5 名考评员组成考评小组,根据考生现场操作表现及实际操作输出结果,参照统一标准评定得
分。两项鉴定均采用百分制,皆达 60 分及以上者为合格。
1.8.4 考评人员与考生配比
理论知识考试:15~20 名考生配 1 名考评员、技能操作考核:5~8 名考生配 1 名考评员。
1。8。5 鉴定时间
各等级的理论知识考试时间为 90 min;技能操作考核:初级 90 min;中级 120 min;高级 180
min。
1。8.6 鉴定场地设备
理论知识考试在标准教室内进行,技能操作考核在具有满足考核需要的计算机系统、相关设备
和软件的实操教室内进行。
2。 基本要求
2。1 职业道德
2。1。1 职业道德基本知识
2.1.2 职业守则
(1)遵纪守法,尊重知识产权,杜绝做假,严守保密制度。
(2)实事求是,工作认真,尽职尽责,一丝不苟,精益求精。
2。2 基础知识
2。2。1 计算机概述
计算机一般知识。
2.2.2 计算机硬件知识
(1)计算机基本组成。
计算机操作员国家职业标准
为进一步强化公司安全生产、文明施工管理,切实落实安全生产责任,防止重大安全事故发生,保障企业和员工的生命和财产安全manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. 6.4.4.4 lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. 6.4.4.5 high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the corresponding
(2)基本外部设备及使用。
2.2。3 计算机软件知识
(1)软件基础知识.
(2)计算机常用软件。
2.2。4 计算机操作系统
(1)操作系统基础知识。
(2)计算机常用操作系统的使用。
(3)计算机文件系统的结构.
(4)计算机文件系统的使用管理。
2。2。5 文字处理基础知识
(1)汉字信息处理基础知识.
(2)文字输入技术。
(3)常用文字处理、排版软件的使用。
(4)常见排版物的格式规范。
(5)排版工艺基础知识。
(6)文字信息处理工艺与质量管理。
2。2.6 多媒体基础知识
(1)多媒体常识.
(2)多媒体信息处理。
(3)多媒体基本应用。
2.2.7 计算机网络基础知识
(1)计算机网络常识。
(2)局域网络的组成.
剩余18页未读,继续阅读
智慧安全方案
- 粉丝: 3653
- 资源: 59万+
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功
评论0