第 16 章 前台销售管理......................................................................................................................2
16.1 概述.....................................................................................................................................2
16.2 详细使用说明.....................................................................................................................2
16.2.1 登录界面..................................................................................................................2
16.2.1.1 登录界面.......................................................................................................2
16.2.1.2 登录提示.......................................................................................................3
16.2.1.3 记账日期核对...............................................................................................4
16.2.1.4 下载信息提示...............................................................................................4
16.2.1.5 收银界面.......................................................................................................4
are formulated, detailed provisions to engineering protecon of nished and semi-nished products. Finished and semi-nished products to be stopped for damage and educaon and, if necessary, site leader holds pares and party's construcon team leader and technicians responsible, ned and posted by educang employees. 2, scienc and reasonable arrangements should be strictly in accordance with operang procedures lines hoisng construcon hoisng sequence to prevent falls from a height. Tree planng tree supports the note immediately a!er work, xed plant, prevent them from being blown over. Cross should be avoided in the construcon job lead to product damage. Not re working in the cable area, electricity, re near welding operaons shall be protected and smash-proof measures. 3, well before the construcon drawing design and construcon technology to give the low-down and construcon design drawing environment well before construcon work and work construcon technology to give the low-down, prevents rework due to work ne or damage to nished product. Should invesgate before construcon embedded facilies and the surrounding environment and, if necessary, adopt e)ecve measures of protecon, isolaon. 4, a+enon schedule cross in favour of nished and semi-nished products to protect jobs. 5, protecon and isolaon measures taken during the construcon process. Construcon
site