![](https://csdnimg.cn/release/download_crawler_static/85963943/bg3.jpg)
解
1.外墙中心线长度:
(6.3+9.6)×2=31.80M
2.内墙净长线长度:
(4.2+6.3×2-0.24×3)=16.08M
3.内墙基顶净长线长度:
(4.2+6.3×2-0.30×3)=15.90M
4.内墙垫层净长线长度:
(4.2-0.5-0.4)+(6.3-0.5×2)+(6.3-0.5-0.4)=14.00M
5.内墙槽底净长线长度:
(4.2-0.8-0.7)+(6.3-0.8×2)+(6.3-0.8-0.7)=13.10M
6.清单基础土方工程量:
(1)外墙:31.8×1.0×2.0=63.60 m3
(2)内墙:14.00×0.8×2.0=22.40 m3
合计:86.00 m3
7.清单 M10 水泥沙浆毛条石基础工程量:
31.8×(0.8×0.6+0.3×0.3)+15.9×(0.6×0.6+0.3×0.3)-0.6×0.25×0.6×4-0.6×0.15
×0.6×2=24.81 m3
8.C10 砼垫层:
(31.8×1.0+14.0×0.8)×0.1=4.30 m3
9.清单 M7.5 水泥沙浆标准砖基础工程量:
(31.8+16.08)×0.24×1.30=14.94 m3
10.余土外运:
24.81+4.30+(31.8+16.08)×0.24×1.0=40.60 m3