没有合适的资源?快使用搜索试试~ 我知道了~
ThinkSystemSR635维护手册 该文档包含了:1.针对设备组件的介绍 2.设备拆卸或安装备件方法 3.故障问题确认 4.设备介绍等 细节问题 若有需要请下载;
资源推荐
资源详情
资源评论
ThinkSystem SR635
Maintenance Manual
Machine Types: 7Y98 and 7Y99
Note
Before using this information and the product it supports, be sure to read and understand the safety
information and the safety instructions, which are available at:
http://thinksystem.lenovofiles.com/help/topic/safety_documentation/pdf_files.html
In addition, ensure that you are familiar with the terms and conditions of the Lenovo warranty for your server,
which can be found at:
http://datacentersupport.lenovo.com/warrantylookup
Fifteenth Edition (April 2023)
© Copyright Lenovo 2019, 2023.
LIMITED AND RESTRICTED RIGHTS NOTICE: If data or software is delivered pursuant to a General Services
Administration (GSA) contract, use, reproduction, or disclosure is subject to restrictions set forth in Contract No. GS-35F-
05925.
Contents
Contents . . . . . . . . . . . . . . . . . i
Safety . . . . . . . . . . . . . . . . . . v
Safety inspection checklist . . . . . . . . . . . vi
Chapter 1. Introduction . . . . . . . . . 1
Specifications . . . . . . . . . . . . . . . . 2
Particulate contamination . . . . . . . . . . 8
Firmware updates . . . . . . . . . . . . . . . 9
Tech Tips . . . . . . . . . . . . . . . . . 11
Security advisories . . . . . . . . . . . . . 12
Power on the server . . . . . . . . . . . . . 12
Power off the server . . . . . . . . . . . . . 12
Chapter 2. Server components . . . . 13
Front view . . . . . . . . . . . . . . . . . 13
Operator information panel . . . . . . . . . . 15
Rear view . . . . . . . . . . . . . . . . . 16
Rear view LEDs . . . . . . . . . . . . . . . 20
System board components . . . . . . . . . . 21
System board LEDs . . . . . . . . . . . . . 23
System board jumpers . . . . . . . . . . . . 26
Internal cable routing. . . . . . . . . . . . . 27
Power/Sideband cable routing . . . . . . . 28
Server model with four 3.5-inch SAS/SATA
drives . . . . . . . . . . . . . . . . . 30
Server model with eight 2.5-inch SAS/SATA
drives . . . . . . . . . . . . . . . . . 39
Server model with six 2.5-inch SAS/SATA
drives and four 2.5-inch NVMe drives . . . . 47
Server model with ten 2.5-inch SAS/SATA/
NVMe drives . . . . . . . . . . . . . . 55
M.2 module cable routing . . . . . . . . . 70
Super capacitor cable routing . . . . . . . 70
VGA/USB/Front panel connector . . . . . . 72
Intrusion switch cable routing . . . . . . . 74
Parts list. . . . . . . . . . . . . . . . . . 75
Power cords . . . . . . . . . . . . . . 78
Chapter 3. Hardware replacement
procedures . . . . . . . . . . . . . . . 81
Installation Guidelines . . . . . . . . . . . . 81
Safety inspection checklist. . . . . . . . . 82
System reliability guidelines . . . . . . . . 83
Working inside the server with the power on . . 83
Handling static-sensitive devices . . . . . . 84
Memory module installation rules . . . . . . . . 84
Technical rules . . . . . . . . . . . . . . . 86
Technical rules for processor and heat sink . . 86
Technical rules for power supply . . . . . . 87
Technical rules for system fans . . . . . . . 89
Technical rules for GPU adapters . . . . . . 89
Technical rules for drives . . . . . . . . . 91
Technical rules for HBA/RAID adapters . . . . 91
Technical rules for PCIe NVMe adapter . . . . 92
Technical rules for Ethernet adapters. . . . . 92
Technical rules for OCP 3.0 Ethernet
adapters . . . . . . . . . . . . . . . . 93
Top cover replacement . . . . . . . . . . . . 94
Remove the top cover . . . . . . . . . . 94
Install the top cover . . . . . . . . . . . 96
Air baffle replacement . . . . . . . . . . . . 97
Remove the air baffle . . . . . . . . . . . 97
Install the air baffle . . . . . . . . . . . . 98
Rack latches replacement. . . . . . . . . . . 99
Remove the rack latches . . . . . . . . . 99
Install the rack latches . . . . . . . . . . 101
Security bezel replacement . . . . . . . . . . 103
Remove the security bezel . . . . . . . . . 103
Install the security bezel. . . . . . . . . . 104
System fan replacement . . . . . . . . . . . 106
Remove a system fan. . . . . . . . . . . 106
Install a system fan. . . . . . . . . . . . 108
Memory module replacement . . . . . . . . . 109
Remove a memory module . . . . . . . . 109
Install a memory module . . . . . . . . . 111
Hot-swap drive replacement . . . . . . . . . . 113
Remove a hot-swap drive . . . . . . . . . 113
Install a hot-swap drive . . . . . . . . . . 114
OCP 3.0 Ethernet adapter replacement . . . . . 116
Remove the OCP 3.0 Ethernet adapter . . . . 116
Install the OCP 3.0 Ethernet adapter . . . . . 117
Internal riser assembly replacement . . . . . . . 118
Remove the internal riser assembly . . . . . 118
Install the internal riser assembly . . . . . . 119
Riser card replacement . . . . . . . . . . . . 120
Remove a riser card . . . . . . . . . . . 121
Install a riser card . . . . . . . . . . . . 123
PCIe adapter replacement. . . . . . . . . . . 124
Remove a PCIe adapter . . . . . . . . . . 125
Install a PCIe adapter . . . . . . . . . . . 128
Intrusion switch replacement . . . . . . . . . 131
Remove an intrusion switch . . . . . . . . 131
Install an intrusion switch . . . . . . . . . 132
© Copyright Lenovo 2019, 2023 i
GPU replacement . . . . . . . . . . . . . . 133
Remove a GPU adapter . . . . . . . . . . 133
Install a GPU adapter . . . . . . . . . . . 134
Backplane replacement. . . . . . . . . . . . 134
Remove the backplane for four 3.5-inch hot-
swap drives . . . . . . . . . . . . . . 134
Install the backplane for four 3.5-inch hot-
swap drives . . . . . . . . . . . . . . 135
Remove the backplane for eight 2.5-inch hot-
swap drives . . . . . . . . . . . . . . 136
Install the backplane for eight 2.5-inch hot-
swap drives . . . . . . . . . . . . . . 137
Remove the backplane for ten 2.5-inch hot-
swap drives . . . . . . . . . . . . . . 138
Install the backplane for ten 2.5-inch hot-
swap drives . . . . . . . . . . . . . . 139
Remove the rear backplane . . . . . . . . 140
Install the rear backplane . . . . . . . . . 142
CMOS battery replacement . . . . . . . . . . 144
Remove the CMOS battery . . . . . . . . 144
Install the CMOS battery . . . . . . . . . 146
TPM adapter replacement. . . . . . . . . . . 148
Remove the TPM adapter . . . . . . . . . 148
Install the TPM adapter . . . . . . . . . . 149
Rear hot-swap drive cage replacement . . . . . 150
Remove the rear hot-swap drive cage . . . . 150
Install the rear hot-swap drive cage . . . . . 151
Middle drive cage replacement . . . . . . . . . 155
Remove the middle drive cage . . . . . . . 155
Install the middle drive cage . . . . . . . . 158
M.2 adapter and M.2 drive replacement . . . . . 161
Remove the M.2 adapter and M.2 drive. . . . 161
Adjust the retainer on the M.2 adapter . . . . 164
Install the M.2 adapter and M.2 drive. . . . . 165
RAID super capacitor module replacement . . . . 168
Remove a super capacitor module on the M.2/
riser support bracket . . . . . . . . . . . 168
Install a super capacitor module on the M.2/
riser support bracket . . . . . . . . . . . 169
Remove the RAID super capacitor module on
the chassis . . . . . . . . . . . . . . . 170
Install the RAID super capacitor module on
the chassis . . . . . . . . . . . . . . . 171
Front I/O assembly replacement . . . . . . . . 174
Remove the front I/O assembly . . . . . . . 174
Install the front I/O assembly . . . . . . . . 175
Hot-swap power supply replacement . . . . . . 175
Remove a hot-swap power supply. . . . . . 176
Install a hot-swap power supply . . . . . . 180
Heat sink and microprocessor replacement . . . . 185
Remove a heat sink . . . . . . . . . . . 185
Remove a processor . . . . . . . . . . . 187
Install a processor . . . . . . . . . . . . 187
Install a heat sink . . . . . . . . . . . . 188
Fan board replacement . . . . . . . . . . . . 190
Remove the fan board . . . . . . . . . . 190
Install the fan board . . . . . . . . . . . 191
Power inverter board (PIB) replacement . . . . . 192
Remove the PIB board . . . . . . . . . . 192
Install the PIB board . . . . . . . . . . . 193
System board replacement (trained technician
only) . . . . . . . . . . . . . . . . . . . 193
Remove the system board . . . . . . . . . 194
Install the system board . . . . . . . . . . 196
Update the Vital Product Data (VPD) . . . . . 197
Enable TPM . . . . . . . . . . . . . . 199
Enable UEFI Secure Boot . . . . . . . . . 200
Complete the parts replacement . . . . . . . . 200
Chapter 4. Problem
determination . . . . . . . . . . . . . 203
Event logs . . . . . . . . . . . . . . . . . 203
Light path diagnostics . . . . . . . . . . . . 204
General problem determination procedures . . . . 204
Resolving suspected power problems . . . . 205
Resolving suspected Ethernet controller
problems . . . . . . . . . . . . . . . 205
Troubleshooting by symptom . . . . . . . . . 206
Power on and power off problems . . . . . . 206
Memory problems . . . . . . . . . . . . 208
Hard disk drive problems . . . . . . . . . 209
Monitor and video problems . . . . . . . . 211
Keyboard, mouse, or USB-device
problems . . . . . . . . . . . . . . . 212
Optional-device problems . . . . . . . . . 213
Serial-device problems . . . . . . . . . . 214
Intermittent problems. . . . . . . . . . . 215
Power problems . . . . . . . . . . . . . 216
Network problems . . . . . . . . . . . . 216
Observable problems. . . . . . . . . . . 217
Software problems. . . . . . . . . . . . 219
Appendix A. Hardware
disassembling for recycle . . . . . . . 221
Disassembling the system board for recycle. . . . 221
Appendix B. Getting help and
technical assistance . . . . . . . . . . 223
Before you call . . . . . . . . . . . . . . . 223
Collecting service data . . . . . . . . . . . . 224
Contacting Support . . . . . . . . . . . . . 224
Appendix C. Notices. . . . . . . . . . 225
Trademarks . . . . . . . . . . . . . . . . 226
ii ThinkSystem SR635 Maintenance Manual
Important notes . . . . . . . . . . . . . . . 226
Telecommunication regulatory statement. . . . . 226
Electronic emission notices . . . . . . . . . . 226
Taiwan Region BSMI RoHS declaration. . . . 227
Taiwan Region import and export contact
information . . . . . . . . . . . . . . . . 227
Index . . . . . . . . . . . . . . . . . . 229
© Copyright Lenovo 2019, 2023 iii
剩余243页未读,继续阅读
资源评论
「已注销」
- 粉丝: 5
- 资源: 138
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功