没有合适的资源?快使用搜索试试~ 我知道了~
车联网英文22885-e00.doc
1.该资源内容由用户上传,如若侵权请联系客服进行举报
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
版权申诉
0 下载量 196 浏览量
2022-10-14
14:09:04
上传
评论
收藏 2.43MB DOC 举报
温馨提示
试读
50页
车联网英文22885-e00.doc
资源详情
资源评论
3GPP TR 22.885 V14.0.0 (2015-12)
Technical Report
3
rd
Generation Partnership Project;
Technical Specification Group Services and System Aspects;
Study on LTE support for Vehicle to Everything (V2X) services
(Release 14)
The present document has been developed within the 3
rd
Generation Partnership Project (3GPP
TM
) and may be further elaborated for the purposes of 3GPP.
The present document has not been subject to any approval process by the 3GPP
Organizational Partners and shall not be implemented.
This Report is provided for future development work within 3GPP
only. The Organizational Partners accept no liability for any use of this Specification.
Specifications and Reports for implementation of the 3GPP
TM
system should be obtained via the 3GPP Organizational Partners' Publications Offices.
3GPP
3GPP TR 22.885 V14.0.0 (2015-12)
2
Release 14
Keywords
Vehicular Communication, LTE-based V2X
3GPP
Postal address
3GPP support office address
650 Route des Lucioles - Sophia Antipolis
Valbonne - France
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Internet
http://www.3gpp.org
Copyright Notification
No part may be reproduced except as authorized by written permission.
The copyright and the foregoing restriction extend to reproduction in all media.
© 2015, 3GPP Organizational Partners (ARIB, ATIS, CCSA, ETSI, TSDSI, TTA, TTC).
All rights reserved.
UMTS™ is a Trade Mark of ETSI registered for the benefit of its members
3GPP™ is a Trade Mark of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners
LTE™ is a Trade Mark of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners
GSM® and the GSM logo are registered and owned by the GSM Association
3GPP
3GPP TR 22.885 V14.0.0 (2015-12)
3
Release 14
Contents
Foreword .............................................................................................................................................................7
Introduction .........................................................................................................................................................7
1 Scope.........................................................................................................................................................8
2 References.................................................................................................................................................8
3 Definitions and abbreviations ...................................................................................................................8
3.1 Definitions ...........................................................................................................................................................8
3.2 Abbreviations.......................................................................................................................................................9
4 Overview...................................................................................................................................................9
4.1 Types of V2X ......................................................................................................................................................9
4.2 Vehicle-to-Vehicle (V2V) .................................................................................................................................10
4.3 Vehicle-to-Infrastructure (V2I) .........................................................................................................................10
4.4 Vehicle-to-Pedestrian (V2P)..............................................................................................................................10
5 Use Cases................................................................................................................................................10
5.1 Forward Collision Warning ...............................................................................................................................10
5.1.1 Description...................................................................................................................................................10
5.1.2 Pre-conditions ..............................................................................................................................................10
5.1.3 Service Flows...............................................................................................................................................11
5.1.4 Post-conditions.............................................................................................................................................11
5.1.5 Potential Requirements ................................................................................................................................11
5.2 Control Loss Warning .......................................................................................................................................12
5.2.1 Description...................................................................................................................................................12
5.2.2 Pre-conditions ..............................................................................................................................................12
5.2.3 Service Flows...............................................................................................................................................12
5.2.4 Post-conditions.............................................................................................................................................12
5.2.5 Potential Requirements ................................................................................................................................12
5.3 V2V Use case for emergency vehicle warning..................................................................................................13
5.3.1 Description...................................................................................................................................................13
5.3.2 Pre-Conditions .............................................................................................................................................13
5.3.3 Service Flows...............................................................................................................................................13
5.3.4 Post-Conditions............................................................................................................................................13
5.3.5 Potential Requirements ................................................................................................................................13
5.4 V2V Emergency Stop Use Case........................................................................................................................14
5.4.1 Description...................................................................................................................................................14
5.4.2 Pre-Conditions .............................................................................................................................................14
5.4.3 Service Flows...............................................................................................................................................14
5.4.4 Post-Conditions............................................................................................................................................14
5.4.5 Potential Requirements ................................................................................................................................14
5.5 Cooperative Adaptive Cruise Control ...............................................................................................................14
5.5.1 Description...................................................................................................................................................14
5.5.2 Pre-conditions ..............................................................................................................................................14
5.5.3 Service Flows...............................................................................................................................................15
5.5.4 Post-conditions.............................................................................................................................................15
5.5.5 Potential Requirements ................................................................................................................................15
5.6 V2I Emergency Stop Use Case .........................................................................................................................15
5.6.1 Description...................................................................................................................................................15
5.6.2 Pre-Conditions .............................................................................................................................................15
5.6.3 Service Flows...............................................................................................................................................15
5.6.4 Post-Conditions............................................................................................................................................16
5.6.5 Potential Requirements ................................................................................................................................16
5.7 Queue Warning..................................................................................................................................................16
5.7.1 Description...................................................................................................................................................16
5.7.2 Pre-conditions ..............................................................................................................................................16
5.7.3 Service Flows...............................................................................................................................................16
3GPP
3GPP TR 22.885 V14.0.0 (2015-12)
4
Release 14
5.7.4 Post-conditions.............................................................................................................................................17
5.7.5 Potential Requirements ................................................................................................................................17
5.8 Road safety services ..........................................................................................................................................17
5.8.1 Description...................................................................................................................................................17
5.8.2 Pre-conditions ..............................................................................................................................................18
5.8.3 Service Flows...............................................................................................................................................18
5.8.4 Post-conditions.............................................................................................................................................18
5.8.5 Potential Requirements ................................................................................................................................19
5.9 Automated Parking System ...............................................................................................................................19
5.9.1 Description...................................................................................................................................................19
5.9.2 Pre-conditions ..............................................................................................................................................19
5.9.3 Service Flows...............................................................................................................................................19
5.9.4 Post-conditions.............................................................................................................................................20
5.9.5 Potential Requirements ................................................................................................................................20
5.10 Wrong way driving warning..............................................................................................................................20
5.10.1 Description...................................................................................................................................................20
5.10.2 Pre-Conditions .............................................................................................................................................20
5.10.3 Service Flows...............................................................................................................................................20
5.10.4 Post-Conditions............................................................................................................................................20
5.10.5 Potential Requirements ................................................................................................................................21
5.11 V2X message transfer under MNO control.......................................................................................................21
5.11.1 Description...................................................................................................................................................21
5.11.2 Pre-Conditions .............................................................................................................................................21
5.11.3 Service Flows...............................................................................................................................................21
5.11.4 Post-Conditions............................................................................................................................................21
5.11.5 Potential Requirements ................................................................................................................................21
5.12 Pre-crash Sensing Warning ...............................................................................................................................22
5.12.1 Description...................................................................................................................................................22
5.12.2 Pre-conditions ..............................................................................................................................................22
5.12.3 Service Flows...............................................................................................................................................22
5.12.4 Post-conditions.............................................................................................................................................22
5.12.5 Potential Requirements ................................................................................................................................22
5.13 V2X in areas outside network coverage ............................................................................................................23
5.13.1 Description...................................................................................................................................................23
5.13.2 Pre-conditions ..............................................................................................................................................23
5.13.3 Service Flows...............................................................................................................................................23
5.13.4 Post-conditions.............................................................................................................................................23
5.13.5 Potential Requirements ................................................................................................................................23
5.14 V2X Road safety service via infrastructure.......................................................................................................24
5.14.1 Description...................................................................................................................................................24
5.14.2 Pre-conditions ..............................................................................................................................................24
5.14.3 Service Flows...............................................................................................................................................24
5.14.4 Post-conditions.............................................................................................................................................25
5.14.5 Potential Requirements ................................................................................................................................25
5.15 V2N Traffic Flow Optimisation ........................................................................................................................25
5.15.1 Description...................................................................................................................................................25
5.15.2 Pre-Conditions .............................................................................................................................................25
5.15.3 Service Flows...............................................................................................................................................26
5.15.4 Post-Conditions............................................................................................................................................26
5.15.5 Potential Requirements ................................................................................................................................26
5.16 Curve Speed Warning........................................................................................................................................27
5.16.1 Description...................................................................................................................................................27
5.16.2 Pre-conditions ..............................................................................................................................................27
5.16.3 Service Flows...............................................................................................................................................27
5.16.4 Post-conditions.............................................................................................................................................27
5.16.5 Potential Requirements ................................................................................................................................27
5.17 Warning to Pedestrian against Pedestrian Collision..........................................................................................28
5.17.1 Description...................................................................................................................................................28
5.17.2 Pre-conditions ..............................................................................................................................................28
5.17.3 Service Flows...............................................................................................................................................28
5.17.4 Post-conditions.............................................................................................................................................28
5.17.5 Potential Requirements ................................................................................................................................29
3GPP
3GPP TR 22.885 V14.0.0 (2015-12)
5
Release 14
5.18 Vulnerable Road User (VRU) Safety ................................................................................................................29
5.18.1 Description...................................................................................................................................................29
5.18.2 Pre-conditions ..............................................................................................................................................30
5.18.3 Service Flows...............................................................................................................................................30
5.18.4 Post-conditions.............................................................................................................................................30
5.18.5 Potential Requirements ................................................................................................................................30
5.19 V2X by UE-type RSU .......................................................................................................................................31
5.19.1 Description...................................................................................................................................................31
5.19.2 Pre-conditions ..............................................................................................................................................31
5.19.3 Service Flows...............................................................................................................................................32
5.19.4 Post-conditions.............................................................................................................................................32
5.19.5 Potential Requirements ................................................................................................................................32
5.20 V2X Minimum QoS ..........................................................................................................................................32
5.20.1 Description...................................................................................................................................................32
5.20.2 Pre-conditions ..............................................................................................................................................32
5.20.3 Service Flows...............................................................................................................................................32
5.20.4 Post-conditions.............................................................................................................................................33
5.20.5 Potential Requirements ................................................................................................................................33
5.21 Use case for V2X access when roaming............................................................................................................33
5.21.1 Description...................................................................................................................................................33
5.21.2 Pre-conditions ..............................................................................................................................................33
5.21.3 Service Flows...............................................................................................................................................33
5.21.4 Post-conditions.............................................................................................................................................33
5.21.5 Potential Requirements ................................................................................................................................34
5.22 Pedestrian Road Safety via V2P awareness messages ......................................................................................34
5.22.1 Description...................................................................................................................................................34
5.22.2 Pre-conditions ..............................................................................................................................................34
5.22.3 Service Flows...............................................................................................................................................35
5.22.4 Post-conditions.............................................................................................................................................35
5.22.5 Potential Requirements ................................................................................................................................35
5.23 Mixed Use Traffic Management........................................................................................................................35
5.23.1 Description...................................................................................................................................................35
5.23.2 Pre-conditions ..............................................................................................................................................35
5.23.3 Service Flows...............................................................................................................................................36
5.23.4 Post-conditions.............................................................................................................................................36
5.23.5 Potential Requirements ................................................................................................................................36
5.24 Enhancing Positional Precision for traffic participants .....................................................................................36
5.24.1 Description...................................................................................................................................................36
5.24.2 (void)............................................................................................................................................................36
5.24.3 (void)............................................................................................................................................................36
5.24.4 (void)............................................................................................................................................................36
5.24.5 Potential Requirements ................................................................................................................................36
5.25 Privacy in the V2V communication environment .............................................................................................36
5.25.1 Description...................................................................................................................................................36
5.25.2 Pre-conditions ..............................................................................................................................................37
5.25.3 Service Flows...............................................................................................................................................37
5.25.4 Post-conditions.............................................................................................................................................37
5.25.5 Potential Requirements ................................................................................................................................37
5.26 V2N Use Case to provide overview to road traffic participants and interested parties.....................................37
5.26.1 Description...................................................................................................................................................37
5.26.2 Pre-Conditions .............................................................................................................................................38
5.26.3 Service Flows...............................................................................................................................................38
5.26.4 Post-Conditions............................................................................................................................................38
5.26.5 Potential Requirements ................................................................................................................................38
5.27 Remote diagnosis and just in time repair notification .......................................................................................39
5.27.1 Description...................................................................................................................................................39
5.27.2 Pre-conditions ..............................................................................................................................................39
5.27.3 Service Flows...............................................................................................................................................39
5.27.4 Post-conditions.............................................................................................................................................40
5.27.6 Potential Requirements ................................................................................................................................40
剩余49页未读,继续阅读
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功
评论0
最新资源