没有合适的资源?快使用搜索试试~ 我知道了~
MIL_STD_973.1146.pdf
1.该资源内容由用户上传,如若侵权请联系客服进行举报
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
版权申诉
0 下载量 84 浏览量
2023-08-03
11:07:14
上传
评论
收藏 9.38MB PDF 举报
温馨提示
试读
258页
MIL_STD_973.1146.pdf
资源推荐
资源详情
资源评论
MIL-STD-973
17 April 1992
SUPERSEDING
(See section 6.4)
MILITARY STANDARD
CONFIGURATION MANAGEMENT
AMSC No. D6728 AREA CMAN
Distribution Statement A: Approved for public release; distribution is unlimited
NOT MEASUREMENT
SENSITIVE
Downloaded from http://www.everyspec.com
FOREWORD
1.
This Military Standard is approved for use by all
Departments and Agencies of the Department of Defense (DoD) .
2.
MIL-STD-973 is jointly sponsored by the Office of the
Secretary of Defense and the Joint Logistics Commanders.
The
primary purpose of this standard is to consolidate configuration
management requirements which were previously scattered
throughout several configuration management standardization
documents.
As a result of this consolidation effort, MIL-STD-973
significantly reduces the number of configuration management
standards in the DoD inventory.
Those standards that are
superseded by MIL-STD-973 are identified in Section 6.
Although
consolidation is the primary purpose of this initiative,
MIL-STD-973 does contain new material.
Some requirements from
superseded standards have been modified to clarify ambiguities or
to resolve inconsistencies.
Some obsolete or redundant
requirements from superseded standards have been modified or
deleted entirely.
Computer-aided Acquisition and Logistic
Support (CALS) has been addressed in this issue to the extent
practicable.
Alsot
some new requirements have been identified
and included.
3.
This standard has been developed for use by both
contractors and Government activities.
Toward this end, the term
“contractor”
has been used throughout to denote an activity
performing any of the requirements of this standard. A
“contractor”
can be either a contractor or Government activity.
Wherever it is necessary to differentiate between the contractor
and the tasking activity (i.e. ,
the Government Contracting
Activity which awards a contract to a contractor, the Government
Program Management Office which tasks another Government
activity, or a contractor which tasks a subcontractor) , the term
“Government”
has been used throughout to denote the activity
imposing the requirements of this standard on the other.
4. This standard defines the ~equirements of configuration
management as they apply to defense materiel items.
Configuration management
is a management discipline applied to
configuration items (CIS)
over their
life cycle to ensure that
the characteristics of CIS meet defined user requirements.
5.
configuration management requirements for software have
been included in this standard.
Where requirements are common to
both hardware and software items,
they are shown as requirements
for CIS.
Where requirements are not common to both hardware and
ii
Downloaded from http://www.everyspec.com
MIL-STD-973
--
software items,
they are shown as requirements for computer
software configuration items (CSCIS) or hardware configuration
items (HWCIS) , as applicable.
6. Beneficial comments (recommendations, additions,
deletions) and any pertinent data which may be of use in
improving this document should be addressed to:
Chief,
Plans and
Policy Division,
CALS Evaluation and Integration Office, 5203
Leesburg Pike, Suite 1403, Falls Church, VA 22041-3466, by using
the self-addressed Standardization Document Improvement Proposal
(DD Form 1426) appearing at the end of this document or by
letter.
iii
Downloaded from http://www.everyspec.com
MIL-STD-973
CONTENTS
PARAGRAPH
PAGE
1.
1.1
1.2
1.3
2.
2.1
2.1.1
2.1.2
2.2
3.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
3.25
3.26
3.27
3.28
3.29
3.30
3.31
SCOPE . . . . . . . . . . . . . . . . . . . . . . .
Scope . . . . . . . . . . . . . . . . . . . . . .
Applicability . . . . . . . . . . . . . . . . . .
Tailoring of requirements . . . . . . . . . . . .
APPLICABLE DOCUMENTS . . . . . . . . . . . . . . . .
Government documents . . . . . . . . . . . . . . .
Specifications, standards, and handbooks . . . . .
Other Government documents . . . . . . . . . . . .
Order of precedence . . . . . . . . . . . . . . .
DEFINITIONS . . . . . . . . . . . . . . . . . .
● .
Acronyms used in this standard . . . . . . . . . .
Advance Change Study Notice (ACSN) . . . . . . . .
Allocated Baseline (ABL) . . . . . . . . . . . . .
Allocated Configuration Documentation (ACD) . . .
Approval/contractual implementation . . . . . . .
Configuration Baseline . . . . . . . . . . . . . .
Block change concept . . . . . . . . . . . . . . .
Classification of defects . . . . . . . . . . . .
Commercial and Government Entity (CAGE) Code . . .
Computer database . . . . . . . . . . . . . . . .
Computer data definition . . . . . . . . . . . . .
Computer software . . . . . . . . . . . . . . . .
Computer Software Component (CSC) . . . . . . . .
Computer Software Configuration Item (CSCI) . . .
Computer software documentation . . . . . . . . .
Computer Software Unit (CSU) . . . . . . . . . . .
Configuration . . . . . . . . . . . . . . . . . .
Configuration audit . . . . . . . . . . . . . . .
Configuration control
. . . . . . .
Configuration Control B;a;d.(;CB). 1 . . . . . . .
Configuration documentation . . . . . . . . . . .
Configuration identification . . . . . . . . . . .
Configuration Item (CI) . . . . . . . . . . . . .
Configuration Management (CM) . . . . . . . . . .
Configuration Management Plan (CMP) . . . . . . .
Configuration Status Accounting (CSA) . . . . . .
Contractor. . . . . . . . . . . . . . . . . . . .
Critical item . . . . . . . . . . . . . . . . . .
Data. . . . . . . . . . . . . . . . . . . . .
● .
Defect. . . . . . . . . , . . . . . . . . . . . .
Deficiencies. . . . . . . . . . . . . . . . . ..
1
1
1
1
2
2
2
3
3
4
4
6
6
6
7
7
7
7
7 _.
7
7
7
7
8
8
8
8
8
8
8
8
9
9
9
10
10
10
10
10
10
10
iv
Downloaded from http://www.everyspec.com
PARAGRAPH
3.32
3.33
3*34
3.35
3.36
3.37
3.38
3.39
3.40
3*41
3.42
3*43
3.44
3.45
3.46
3.47
3.48
3.49
3.50
3.51
3.52
3.53
3.54
3.55
3.56
3.57
3.58
3.59
3.60
3.61
3.62
3.63
3.64
3.65
3.66
3.67
3.68
3.69
3.70
3.71
3.72
3.73
3.74
3.75
3.76
MIL-STD-973
CONTENTS
PAGE
Design change. . . . . . . . . . . . . . . . . .
Developmental configuration . . . . . . . . . . .
Deviation. . . . . . . . . . . . . . . . . . . .
Engineering change . . . . . . . . . . . . . . .
Engineering change justification code . . . . . .
Engineering change priorities . . . . . . . . . .
Engineering Change Proposal (ECP) . . . . . . . .
Engineering Change Proposal types . . . . . . . .
Engineering release . . . . . . . . . . . . . . .
Engineering Release Record (ERR) . . . . . . . .
Evaluation . . . . . . . . . . . . . . . . . . .
Exchangeability of items . . . . . . . . . . . .
Firmware . . . . . . . . . . . . . . . . . . . .
Fit. . . . . . . . . . . . . . . . . . . . . . .
Form . . . . . . . . . . . . . . . . . . . . . .
Function . . . . . . . . . . . . . . . . . . . .
Functional area. . . . . . . . . . . . . . . . .
Functional Baseline (FBL) . . . . . . . . . . . .
Functional characteristics . . . . . . . . . . .
Functional Configuration Audit (FCA) . . . . . .
Functional Configuration Documentation (FCD) . .
Hardware . . . . . . . . . . . . . . . . . . . .
Hardware Configuration Item (HWCI) . . . . . . .
Integrated Logistics Support (ILS) . . . . . . .
Interchangeable item . . . . . . . . . . . . . .
Interface. . . . . . . . . . . . . . . . . . . .
Interface control . . . . . . . . . . . . . . . .
Interface Control Drawing (ICD) . . . . . . . . .
Interface Control Working Group (ICWG) . . . . .
Interoperability . . . . . . . . . . . . . . . .
Item . . . . . . . . . . . . . . . . . . . . . .
Life cycle . . . . . . . . . . . . . . . . . . .
Lifecyclecost. . . . . . . . . . . . . . . . .
Manufacturer’s code . . . . . . . . . . . . . . .
Material . . . . . . . . . . . . . . . . . . . .
Non-conformance. . . . . . . . . . . . . . . . .
Non-developmental Item (NDI) . . . . . . . . . .
Non-recurring costs . . . . . . . . . . . . . . .
Notice of Revision (NOR) . . . . . . . . . . . .
Original . . . . . . , . . . . . . . . . . . . .
Physical characteristics
Physical Configuration Aud;t.(~C~)” 1 1 1 R I I R
Product Baseline (PBL) . . . . . . . . . . . . .
Product Configuration Documentation (PCD) . . . .
Recurring costs . . . . . . . . . . . . . . . . .
10
10
10
10
10
10
10
10
10
10
12
12
12
12
12
12
12
12
12
12
12
12
13
13
13
13
13
13
13
13
13
13
13
13
14
14
14
14
14
14
14
14
15
15
15
v
Downloaded from http://www.everyspec.com
剩余257页未读,继续阅读
资源评论
AbelZ_01
- 粉丝: 920
- 资源: 5441
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功