没有合适的资源?快使用搜索试试~ 我知道了~
APQP启动会议.doc
1.该资源内容由用户上传,如若侵权请联系客服进行举报
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
版权申诉
0 下载量 68 浏览量
2022-07-12
12:59:44
上传
评论
收藏 294KB DOC 举报
温馨提示
试读
33页
APQP启动会议.doc
资源推荐
资源详情
资源评论
APQP Kick-Off Meeting
APQP 启动会议(Pre Production Meeting)
The purpose of this meeting is to develop a common understanding
concerning the total requirements of the part/material by assuring
that proper communication and buy-in occurs between GM and the
supplier. This form encompasses questions from the AIAG Advanced
Product Quality Planning and GM APQP Manual GM-1927 manuals. Its
intent is to ensure advanced product quality planning activities
occur at the appropriate time and establish customer requirements
for part qualification, part availability, quality, packaging,
scheduling, and tooling information. Current revisions of all GM
documents listed can be found in the GM Supply Power web site.
本次会议旨在建立双方在对零件、材料的所有要求方面的一致理解。下表包含
了AIAG产品质量先期策划和通用APQP手册GM-1927的问题。其
目的在于确保先期质量策划活动按进度展开,并明确顾客关于零件认可,零件
猎取,质量,包装,打算和工装方面的信息。GM 相关文件的当前版本可在 GM
Supply Power 网站上获得。
This document should be completed by the supplier and provided to
the SQE prior to the meeting date.
本文件应在会议前由供应商填写完成并提交给 SQE。.
DATE
日期:
PROJECT/PROGRAM
项目名称 :
SUPPLIER
供应商:
PART NO 零件号:
零件号
MANUFACTURING
LOCATION 制造场所:
制造场所
PART DESCRIPTION
零件描述零件描述:
Introduction: Present the Common APQP Kick-Off Meeting Overview
(Pre-Production Meeting) presentation to the supplier (reference GM
APQP-3 GM1927-15 Kick-off Meeting Presentation)
介绍:向供应商介绍通用APQP启动会议简介(参考GM1927-15
启动会议介绍)
Section 1.
AIAG APQP Phase 1.0 related questions – Customer Requirements
AIAG的APQP第一时期有关的问题 第一部分 顾客要求
1. Does the supplier understand the applications and intended end use
of the parts/materials , including all factors critical to the
customer?for all customer?
供方是否理解所有顾客的零件 、材料的的应用和最终用途,包括所有
对顾客重要的方面?
Yes 是
No 否
Explain:
理由:
2. Does the supplier have the latest information about program timing
(example: Drawing release, Prototype – series, Matching,
Pilots/MVB, SOP)? Review Program Milestones with supplier
供方是否有关于项目进度的最新信息(如:图纸发放,系列样件,匹
配,试生产,开始正式生产)? 与供方评审项目节点。
Yes 是
No 否
Explain:
理由:
Key Project Milestones
关键项目节点
Dates
日期
Key Project Milestones
关键项目节点
Dates
日期
3. Does the supplier have and understand the QS-9000 or TS16949
Manual, FMEA Manual,SPC Manual, Measurement Systems Analysis
Manual, Quality System Analysis Manual, PPAP Manual and the
Advanced Product Quality Planning (APQP) and Control Plan
Manual ?Manual?
供方是否有并理解QS-9000或 TS16949,FMEA,SPC,MSA,Q
SA,PPAP,APQP和操纵打算手册?
Yes 是
No 否
Explain:
理由:
4. Has the supplier provided all information listed in the
Required
Quality Information
letter as outlined in the RFQ package?
供方是否提供RFQ文件包中的“要求的质量信息”清单中列出的所有信
息?
Yes 是
No 否
Explain:
理由:
5. Does the supplier have and understand all the requirements listed
in the
Supplier Quality Statement of Requirements
and has page 5
been signed and returned GM1927-3 供应商是否有并理解“供应商质量要
求申明”(GM1927-3)中的各项要求,并返回已签字的第5页?
Yes
是
No
否
Explain:
理由:
6. Are returnable containers required? 是否要求重复使用料箱?
Yes
是
No
否
Explain:
理由:
7. Are there any packaging issues to be resolved? 包装方面的问题是
否已解决?
Yes
是
No
否
Explain:
理由:
8. Does supplier agree to provide product in clean
dunnage/containers? 供方是否能用清洁的隔板、料箱放置产品?
Yes
是
No
否
Explain:
理由:
剩余32页未读,继续阅读
资源评论
m0_72661692
- 粉丝: 0
- 资源: 1937
下载权益
C知道特权
VIP文章
课程特权
开通VIP
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功