FORM CDV (IEC)
2009-01-09
® Registered trademark of the International Electrotechnical Commission
18/1523/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJET DE COMITÉ POUR VOTE (CDV)
Project number
Numéro de projet
IEC/IEEE 80005-3 Ed.1
IEC/TC or SC:
18
IEC/CE ou SC:
Secretariat / Secrétariat
Norway
Submitted for parallel voting in
CENELEC
Soumis au vote parallèle au
CENELEC
Date of circulation
Date de diffusion
2016-07-29
Closing date for voting (Voting mandatory for P-members)
Date de clôture du vote (Vote obligatoire pour les membres (P))
2016-10-21
Also of interest to the following committees
Intéresse également les comités suivants
TC64, TC77, TC121, ISO/TC8, ISO/TC188, IMO,
IACS
Supersedes document
Remplace le document
18/1468/CD & 18/1474A/CC
Proposed horizontal standard
Norme horizontale suggérée
Other TC/SCs are requested to indicate their interest, if any, in this CDV to the TC/SC secretary
Les autres CE/SC sont requis d’indiquer leur intérêt, si nécessaire, dans ce CDV à l’intention du secrétaire du CE/SC
Functions concerned
Fonctions concernées
Safety
Sécurité
EMC
CEM
Environment
Environnement
Quality assurance
Assurance qualité
CE DOCUMENT EST TOUJOURS À L'ÉTUDE ET SUSCEPT
IBLE DE
MODIFICATION. IL NE PEUT SERVIR DE RÉFÉRENCE.
LES RÉCIPIENDAIRES DU PRÉSENT DOCUMENT S
ONT INVITÉS À
PRÉSENTER, AVEC LEURS OBSERVATIONS, LA NOTIFICATION DES DROITS
DE PROPRIÉTÉ DONT ILS AURAIENT ÉVENTUELLEMENT CONNAISSANCE ET À
FOURNIR UNE DOCUMENTATION EXPLICATIVE.
THIS DOCUMENT IS STILL UNDER STUDY AND SUBJECT TO CHANGE. IT
SHOULD NOT BE USED FOR REFERENCE PURPOSES.
RECIPIENTS OF THIS DOCUMENT ARE INVITED TO SUBMIT, WITH THEIR
COMMENTS, NOTIFICATION OF ANY RELEVANT PATENT RIGHTS OF
WHICH THEY ARE AWARE AND TO PROVIDE SUPPORTING
DOCUMENTATION.
Title :
IEC/IEEE 80005-3:
Utility connections in port – Part 3: Low Voltage Shore Connection (LVSC) Systems – General
requirements
Introductory note
-
Copyright © 2016 International Electrotechnical Commission, IEC. All rights reserved. It is
permitted to download this electronic file, to make a copy and to print out the content for the sole
purpose of preparing National Committee positions. You may not copy or "mirror" the file or
printed version of the document, or any part of it, for any other purpose without permission in
writing from IEC.
®
18/1523/CDV – 2 – IEC/IEEE CDV80005-3 © IEC/IEEE 2016
CONTENTS
1 Scope .............................................................................................................................10
2 Normative references......................................................................................................10
3 Terms and definitions .....................................................................................................11
3.1 cable management system ....................................................................................11
3.2 plug and socket-outlet ...........................................................................................11
3.2.1 socket-outlet ..............................................................................................12
3.2.2 plug ...........................................................................................................12
3.3 ship coupler ...........................................................................................................12
3.3.1 ship connector ...........................................................................................12
3.3.2 ship inlet ....................................................................................................12
4 General requirements .....................................................................................................13
4.1 System description ................................................................................................13
4.2 Distribution system ................................................................................................14
4.2.1 General .....................................................................................................14
4.2.2 Equipotential bonding ................................................................................14
4.3 Compatibility assessment before connection..........................................................15
4.4 LVSC system design and operation .......................................................................15
4.4.1 System design ...........................................................................................15
4.4.2 System operation .......................................................................................15
4.5 Personnel safety ....................................................................................................16
4.6 Design requirements ..............................................................................................16
4.6.1 General .....................................................................................................16
4.6.2 Protection against moisture and condensation ...........................................16
4.6.3 Location and construction ..........................................................................16
4.6.4 Electrical equipment in hazardous areas ....................................................17
4.7 Electrical requirements ..........................................................................................17
4.8 System study and calculations ...............................................................................17
4.9 Emergency shutdown including emergency-stop facilities ......................................18
5 LV shore supply system requirements .............................................................................19
5.1 Voltages and frequencies ......................................................................................19
5.2 Quality of LV shore supply .....................................................................................20
6 Shore-side installation ....................................................................................................21
6.1 General .................................................................................................................21
6.2 System component requirements ...........................................................................21
6.2.1 Circuit-breaker and disconnector ...............................................................21
6.2.2 Transformer ...............................................................................................22
6.2.3 Neutral earthing resistor ............................................................................22
6.2.4 Equipment earthing conductor bonding ......................................................22
6.3 Shore-to-ship electrical protection system .............................................................22
6.4 LV interlocking .......................................................................................................23
6.4.1 General .....................................................................................................23
6.4.2 Operating of the low-voltage (LV) circuit-breakers and disconnectors ........23
6.5 Shore connection convertor equipment ..................................................................24
6.5.1 General .....................................................................................................24
6.5.2 Degree of protection ..................................................................................24
6.5.3 Cooling ......................................................................................................24
6.5.4 Protection ..................................................................................................24
7 Ship-to-shore connection and interface equipment ..........................................................25
IEC/IEEE CDV80005-3 © IEC/IEEE 2016 – 3 – 18/1523/CDV
7.1
General .................................................................................................................25
7.2 Cable management system ....................................................................................25
7.2.1 General .....................................................................................................25
7.2.2 Monitoring of cable tension ........................................................................26
7.2.3 Monitoring of the cable length ....................................................................27
7.3 Plugs and socket-outlets and ship couplers ...........................................................27
7.3.1 General .....................................................................................................27
7.3.2 Pilot contacts .............................................................................................29
7.4 Ship-to-shore connection cable ..............................................................................29
7.5 Independent control and monitoring cable .............................................................30
7.6 Storage .................................................................................................................30
8 Ship requirements...........................................................................................................30
8.1 General .................................................................................................................30
8.2 Ship electrical distribution system protection .........................................................30
8.2.1 Short-circuit protection ...............................................................................30
8.2.2 Earth fault protection, monitoring and alarm ...............................................30
8.3 Shore connection switchboard ...............................................................................30
8.3.1 General .....................................................................................................30
8.3.2 Circuit-breaker and disconnector ...............................................................31
8.3.3 Instrumentation and protection ...................................................................31
8.4 On-board transformer ............................................................................................31
8.5 On-board receiving switchboard connection point ..................................................32
8.5.1 General .....................................................................................................32
8.5.2 Circuit-breaker ...........................................................................................32
8.5.3 Instrumentation ..........................................................................................32
8.5.4 Protection ..................................................................................................33
8.5.5 Operation of the circuit-breaker..................................................................34
8.6 Ship power restoration ...........................................................................................34
9 LVSC system control and monitoring ..............................................................................34
9.1 General requirements ............................................................................................34
9.2 Load transfer via blackout ......................................................................................35
9.3 Load transfer via automatic synchronization ..........................................................35
9.3.1 General .....................................................................................................35
9.3.2 Protection requirements .............................................................................35
10 Verification and testing ...................................................................................................36
10.1 General .................................................................................................................36
10.2 Initial tests of shore-side installation ......................................................................36
10.2.1 General .....................................................................................................36
10.2.2 Tests .........................................................................................................36
10.3 Initial tests of ship-side installation ........................................................................36
10.3.1 General .....................................................................................................36
10.3.2 Tests .........................................................................................................37
10.4 Tests at the first call at a shore supply point ..........................................................37
10.4.1 General .....................................................................................................37
10.4.2 Tests .........................................................................................................37
11 Periodic tests and maintenance ......................................................................................38
11.1 General .................................................................................................................38
11.2 Tests at repeated calls of a shore supply point ......................................................38
11.2.1 General .....................................................................................................38
18/1523/CDV – 4 – IEC/IEEE CDV80005-3 © IEC/IEEE 2016
11.2.2
Verification ................................................................................................38
12 Documentation ...............................................................................................................38
12.1 General .................................................................................................................38
12.2 System description ................................................................................................38
Annex A (Informative) Ship-to-shore connection cable .........................................................39
A.1 Rated voltage ........................................................................................................39
A.2 Rated cross section / type .....................................................................................39
A.3 General design ......................................................................................................39
A.3.1 General .....................................................................................................39
A.3.2 Conductors ................................................................................................39
A.3.3 Earth conductors........................................................................................40
A.3.4 Pilot elements ............................................................................................40
Annex B (normative) Additional requirements for Offshore Supply, Service and Working Ships41
B.1 Scope ....................................................................................................................41
B.4.1 System description .....................................................................................41
B.4.3Compatibility assessment before connection .................................................42
m) sufficient cable length to reach the receiving point level plus 3 meters. .............42
B.7.2.1General ...............................................................................................................42
B.7.3.1General ......................................................................................................42
Annex C (normative) Additional requirements for Container Ships ........................................43
C.1 Scope ....................................................................................................................43
C.4.1 System description .....................................................................................43
C.4.3Compatibility assessment before connection .................................................44
m) sufficient cable length to reach the supply point level plus 3 meters. ................44
C.7.2.1General ...............................................................................................................44
C.7.3.1General ......................................................................................................44
Annex D (informative) Additional requirements for Tankers ..................................................45
D.1 Scope ....................................................................................................................45
D.4.1 System description ......................................................................................45
D.4.3Compatibility assessment before connection .................................................45
m) sufficient cable length to reach the receiving point level plus 3 meters. .............45
D.4.9 Emergency shutdown including emergency-stop facilities .............................46
D.5.1 Voltages and frequencies .............................................................................46
D.6.2.3Neutral earthing resistor .............................................................................46
D.7.2.1General ......................................................................................................46
D.7.3.1General ......................................................................................................46
Annex E (normative) General operating procedures .............................................................48
Annex F Bibliography ............................................................................................................49
Figure 1 – Block diagram of a typical LVSC system ...............................................................14
Figure 2 – Phase sequence rotation – Positive direction .......................................................20
Figure 3 – Balanced three-phase variables in time domain ....................................................20
Figure 4 – Connection with mobile cable management system ..............................................26
Figure 6 – Safety loop schematic circuit for one feeder (a) or three feeders (b). ....................29
Figure B.1 – General system diagram ...................................................................................41
Figure B.2 – Power plug and socket-outlet contact assignment .............................................42
Figure C.1 – General system diagram ...................................................................................43
Figure C.2 – Power plug and socket-outlet contact assignment .............................................44
Figure D.1 – General system diagram ...................................................................................45
IEC/IEEE CDV80005-3 © IEC/IEEE 2016 – 5 – 18/1523/CDV
Figure D.2 – Power plug and socket pin assignment .............................................................46
Figure D.3 – IS Barrier and cable properties (To be developed) ............................................47
Figure D.4 – Safety loop circuit for LVSC system in tankers (To be developed) .....................47
Figure E.1 – LVSC general operating procedures for connection a) and disconnection b). ....48
剩余49页未读,继续阅读
资源评论
嗨明天
- 粉丝: 0
- 资源: 1
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功