没有合适的资源?快使用搜索试试~ 我知道了~
(精品)软件工程课程设计[医院信息管理系统].doc
需积分: 9 2 下载量 97 浏览量
2022-10-23
23:39:42
上传
评论
收藏 346KB DOC 举报
温馨提示
试读
28页
(精品)软件工程课程设计[医院信息管理系统].doc
资源详情
资源评论
资源推荐
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which
fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of
backward production capacity, increase the intensity of
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度
treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity"
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and
departments to the village and "no unauthorised" created
xx 大学
实训报告
课程(项目)名称: 软件工程课程设计
学 院: 专 业:
班 级: 学 号:
姓 名: 成 绩:
2011 年 01 月 06 日
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which
fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of
backward production capacity, increase the intensity of
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度
treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity"
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and
departments to the village and "no unauthorised" created1
目录
引言 ...............................................................3
摘要 ...............................................................3
1 项目论证和计划....................................................4
1.1 系统调查..............................................................................................................................4
1.2 系统的总体功能需求和性能需求......................................................................................4
1.3 系统开发的框架..................................................................................................................4
2.可行性研究报告 ...................................................5
2.1 技术可行性..........................................................................................................................6
2.2 经济可行性..........................................................................................................................6
2.3 管理可行性..........................................................................................................................6
2.4 开发环境可行性..................................................................................................................6
3 需求分析..........................................................7
3.1 软件需求说明书..................................................................................................................7
3.1.1 业务需求(business requirement).........................................................................7
3.1.2 用户需求(user requirement).....................................................................................7
3.1.3 功能需求(functional requirement) ...........................................................................9
3.2 数据要求说明书................................................................................................................10
3.2.1 数据流分析.............................................................................................................10
3.2.2 数据字典.................................................................................................................12
4 总体设计.........................................................13
4.1 概要设计说明书................................................................................................................13
4.1.1 功能模块图.............................................................................................................13
4.1.2 数据库分析.............................................................................................................14
4.1.2.1 系统 E—R 图 ..............................................................................................................14
4.1.2.2 创建数据库..................................................................................................................14
4.2 详细设计说明书................................................................................................................15
4.2.1 设计思路.................................................................................................................15
4.2.2 编程原理.................................................................................................................15
4.2.3 实例详解.................................................................................................................17
5 使用手册.........................................................23
5.1 如何连数据库....................................................................................................................24
5.2 如何打开主界面................................................................................................................24
5.3.如何进行系统设置............................................................................................................24
5.4 如何管理各项信息............................................................................................................24
5.5 如何收费登记....................................................................................................................25
5.6 如何查看统计信息............................................................................................................25
6 测试与维护.......................................................25
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which
fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of
backward production capacity, increase the intensity of
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度
treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity"
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and
departments to the village and "no unauthorised" created2
6.1 测试结果............................................................................................................................25
6.2 系统维护............................................................................................................................26
7 项目开发总结报告.................................................26
8 参考文献.........................................................26
9.评语 ............................................................28
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which
fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of
backward production capacity, increase the intensity of
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度
treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity"
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and
departments to the village and "no unauthorised" created3
医院信息管理系统
引言
医院(hospital)是以向人提供医疗护理服务为主要目的的医疗机构。
其服务对象不仅包括患者和伤员,也包括处于特定生理状态的健康人
(如孕妇、产妇、新生儿)以及完全健康的人(如来医院进行体格检
查或口腔清洁的人)。其任务不仅包括防病、治病,也包括维持和促
进健康。随着中国经济发展水平的提高,人们越来越重视自身的健康。
现如今我们已步入数字化、网络化的时代。为了更好地适应这种网络
数字化信息的环境,一种成功的跟踪最新技术,充分利用软硬件资源,
扎根于准、新、全数字资源的"医院信息管理系统"已孕育而生。 另
外,由于医院陈旧的管理手段给患者和医院管理人员带来的很多操作
上的不方便,同时为了提高工作效率、服务质量和管理水平,并使医
院管理人员从繁琐的工作中解脱出来,从而使我们下定决心开发该系
统。
摘要
此报告对医院管理系统有一个系统介绍。从文中可以了解此项目
的论证与计划,包括:对系统的调查;对系统的总体功能需求和性能
需求的介绍;以及此系统的开发的框架。报告包含可行性研究报告,
针对技术可行性、经济可行性、管理可行性、开发环境可行性进行了
简明扼要的说明。在系统需求分析中对软件需求与数据需求进行了详
细的分析。报告还在在总体设计上,给出了更加详细的介绍。另外、
随报告还附有使用手册等相关信息。
关键字:软件工程 医院信息管理系统 VC++6.0 SQL2005 ADO
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which
fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of
backward production capacity, increase the intensity of
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度
treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity"
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and
departments to the village and "no unauthorised" created4
1 项目论证和计划
使用 Visual C ++ 6.0 和 SQL Server 2005 设计出医院信息管理系统。使用 SQL Server
2005 建立数据库和表以及相应的视图,使用 Visual C ++ 6.0 建立基于对话框模型的工程框
架。
1.1 系统调查
在医院日常事务中,管理工作是医院非常重要的一项工作,包括:医院系统设置管理、
信息管理、收费管理、统计查询管理。传统的医院信息管理系统是单机单用户方式,开发简
单,能充分利用数据库的特性,实现增、删、改、查等工作。其缺点是开发的系统依赖性强,
功能简单,没有创新项目,不容易升级与扩展,无法实现数据的共享,代码重用性差。
1.2 系统的总体功能需求和性能需求
总体需求:建立一个合理的医院信息管理系统,从而能够对医院信息做完善的管理,使
医院管理更加科学规范,并能根据系统提供的准确信息进行适当的调整,促使医院更好发展
服务于广大群众。采用现有的硬件、软件及科学的管理系统开发方案,建立医院信息管理系
统,实现医院信息管理的自动化。系统应符合医院信息管理制度,并达到操作直观、方便、
实用、安全等要求,并做到以下几点:
1)简单性。系统设计尽量简单,从而实现使用方便、提高效率、节省开支、提高系统
的运行质量。
2)灵活性。系统对外界条件的变化有较强的适应能力。
3)完整性。系统是各个子系统的集合,作为一个有机的整体存在。因此,要求各个子
系统的功能尽量规范,数据采集统一,语言描述一致。
4)可靠性。实现安全的、可靠的数据保护措施。
医院信息管理系统可以用于支持医院完成医院信息管理工作,实现的目标有:
1)支持医院高效率完成医院运营中的日常工作,包括各种信息的增、删、改、查,包
括人事信息的管理等。
2)支持医院信息管理及相关方面的科学决策,如医院领导根据根据药品销售情况决定
购进药品数量等。
1.3 系统开发的框架
系统开发的框架见图 1。
剩余27页未读,继续阅读
智慧安全方案
- 粉丝: 3687
- 资源: 59万+
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功
评论0