没有合适的资源?快使用搜索试试~ 我知道了~
视频会议系统设计方案.pdf
1.该资源内容由用户上传,如若侵权请联系客服进行举报
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
版权申诉
0 下载量 161 浏览量
2023-07-24
23:41:33
上传
评论
收藏 1.25MB PDF 举报
温馨提示
试读
14页
视频会议系统设计方案.pdf
资源推荐
资源详情
资源评论
videoconference , Secretary of the provi ncial Committee of Xia Baol ong stresse d: t his year i s thes thes the years to resolve outsta nding issue s, obviously ws, obviously w ory of the year. The County's departments at all lev els must firmly establish theels must firmly establish the old old n development concept, convince d that Castle is not relaxed, always maintai ning strategic ability and strong determi nation to improve the envir onment, consi stently playing wplaying w he war, ever -hig her level s of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we wi we wi oved at the county level, up tup t basic obje ctive grasp of polluti on control that focus, wit h the focus on thr ee things: ngs: ching the County created. Organi zation zation zation inspection, the County garbage River, bla ck and odorck and odor nvestigation, timely
rectification of problems found in pla ce firmly to prevent river poll ution rebound. In accordance witdance wit ng the inferior five water quality monitori ng stations work this year t o ensure the Elimination of 1 pr ovincial control, five water quality section 3 munici palities controlled deterioration, e nsure the creation tcreation tcreation t ds. Second, pay special attenti on to pollution-cutti ng construction of nanotubes. Intercepti ng nanotubes are t he basis of polluti on of water sour ce engineeri ng, e ngineering, matter of success or failure of water management. Urba n sewage treatment, tn sewage treatment, t age treatment rate, running a ccuracy, compliaccuracy, complia ent, spee d up the town's support network construction, is focusi ng on nanotubes notubes ent in rural areas, this year is the final y ear of the three-year acti on, determinati on to fight a nd the moment um around, endi ng the battle on which fully to
ensure the reali zation of all County 648 forme d village coverage. Also, be sure to atta ch importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and r unning , role play, avoid toid t problem. Thir d, pay spe cial attention to t he River Lake pond desilti ng operation. Provinces now have focuse d on polluti on control of water gcontrol of water gcontrol of water g epening water of this year'of this year' Next, to jump-start a n investigation li ne touches work, implementation pla n according to t he priorities a nd the programme of work, in a ccorda nce with theith theith the detaile d clea ning, dredging plan, pla nning ahead of time cl eanieani way way ding to local conditions to do sludg e, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily poll uting industries. Pollution of water must grab the source, wastewater is primarily the source of ba ckward
production capacity, increase the intensity of
treatment of heavily polluting industries. Accordi ng to municipal , and municipal g overnment depl oyment of seve n big n big ction ction ements to December 2016 end of Qia n, all included s hut st opped elimi nated of enter prise al l shut stopped eliminated in pl ace ; June 30, 2017 Qia n, all included place regulati on upgrade and agglomeration restr ucturing of enter prise by unified standard reg ulation in place, late not standard of enterpri se are implementation discontinue d; June 30, 2018 Qian, all intends Park production of enterpri se relocation Park in pla ce, late not Park of are di scontinued. In the process of renovation, wi ll focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enter prise governance a nd producti on lines, elimi nated a number of yearly emission intensity, low value -added pr oducts of ba ckwar d production capa city. Second, we must stri ctly enforce the spacehe space
environment access system, promoting industry a cce ss and envir onmental conditi ons of acce ss of enter prises to the Park , industrial park, in principle, no l onger the class on the ne w project. Thirdl y, promoting re placement and reconstr uction of heav ily pol luting i ndustries, mergers a nd reorganizat ions, g uide enterpri ses to e nergy conservation, recycli ng and low-car bon and clea n production, and improv e the level of green developme nt. Four to establish a long-term supervision mechanism, i ncrease the i ntensity of spe cial inspe ctions, inve stigate and punish t he rectificati on is not i n place, normal busine ss of running anti-pollution i nstallations do not. (Iii) linkage to pr omote flood control water, drainage, water supply, impr oving water savi ng. Speed up cross ang support river dike reinforcement, and along Pu seawall except insura nce reinforceme nt, and Lake Qian slui ce, and BA Cao sl uice, and cloud cover reservoir, focus flood control drainage e ngineering constructi on, vigor ously ously ously
ngineering, i ncreased geological disa ster hidden poi nts gover nance efforts, solid advance small ba sin torrent disaster governa nce, efforts from essentially solution basi n sex, and regional flood control drainage capacity insufficient of pr obl m. Vigorously implement the piers, algae and ot her water source s prote ction and, pr omoting rural drinking water safety proje cts, setting up water pricing reform and e nvironmental protecti on mechanism, guiding water depth. Further soil poll ution nd repair, strengthe n agricultural non-point source pollution preve ntion, mountain, water, forests, fields, lakes, various elements mut ual long. Four, manage to tighten contrcontr e to sple to spl Baolong , Secretary of pr ovincial party C ommittee stressed that whilhat whilhat whilhat whilhat whil nue to catch on, a nd re solve a split ca nnot be cha nged. All localities and departments to departments to
unauna ated
1
xxxxxx
视频会议系统
建设方案
xxxxxx
2004.05
videoconference , Secretary of the provi ncial Committee of Xia Baol ong stresse d: t his year i s thes the years to resolve outsta ndi ng issues, obviously ws, obviously w ory of the year. The County's departments at all lev els must firmly establish theels must firmly establish the old old n development concept, convince d that Castle is not relaxed, alway s maintaining strategi c ability and strong determination to im prove the envir onment, consi stently playing wplaying w he war, ever -hig her level s of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we wi we wi oved at t he county level, up tup t basi c objective grasp of polluti on control that focus, wit h the focus on thr ee things: ngs: ching the County creat ed. Organization zation zation inspection, the County gar bage River, bla ck and odorck and odor nvestigation, timely
rectification of problems found in pla ce firmly to prevent river poll ution rebound. In accordance witdance wit ng the inferior five water quality monitori ng stations work this year t o ensure the Elimination of 1 pr ovincial control, five water quality section 3 municipalities controlled deteriorati on, ensure the creation tcreation tcreation t ds. Se cond, pay special attenti on to poll ution-cutti ng construction of nanotubes. Intercepti ng nanotubes are t he basis of polluti on of water sour ce engineeri ng, e ngineering, matter of success or failure of water management. Urba n sewage treatment, t o imo im age treatment rate, running accuracy, compliaccuracy, complia spee d up the town's support network co nstruction, is focusi ng on nanotubes notubes ural areas, this year is the final year of the three -year action, determinati on to fight a nd the momentum around, endi ng the battle on which fully to
ensure the reali zation of all County 648 forme d village coverage. Also, be sure to atta ch importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up a nd running , role play, av oid toid t problem. Thir d, pay special attention to t he River Lake pond desilti ng operation. Provinces now have focuse d on pollution control of water gcontrol of water gcontrol of water g epening water of this year'of this year' Next, to jump-start a n investigation li ne touches w ork, implementation pla n according to t he priorities a nd the programme of work, in a ccorda nce with theith theith the detaile d cleaning, dre dging plan, planning ahea d of time cleanieanieani ding to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting i ndustries. Pollution of water must grab the source, wastewater is primarily the source of backward
production capacity, increase the intensity of
treatment of heavily polluting industries. Accordi ng to municipal , and municipal g overnment depl oyment of seven big n big ction ction ements to December 2016 e nd of Qia n, all included shut st opped elimi nated of ent er prise al l shut stopped eli minated in pl ace; June 30, 2017 Qia n, all included place regulation upgrade a nd agglomeration restruct uring of enter prise by unified standard regulation in pl ace, late not standard of enterprise are impleme ntation discontinue d; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in pla ce, late not Park of are discontinued. In the process of renovation, wi ll focus on four aspects: to firmly close the high energy consumption and heavy polluti on, hopeless enter prise governance and pr oducti on li nes, elimi nated a number of yearly emission intensity, low value -added pr oducts of ba ckward production capa city. Second, we must stri ctly enforce the spacehe space
environment access system, promoting industry a cce ss and envir onmental conditi ons of acce ss of enter prises to the Park , industrial park, in principle, no longer the class on the ne w project. Thirdl y, pr omoting re placement and reconstructi on of heav ily pol luting i ndustries, mergers and re organizations, g uide enterpri ses to e nergy conservation, recycli ng and low-car bon and clea n production, and improv e the level of green developme nt. Four to establish a long-term supervision mechanism, i ncrease the i ntensity of spe cial inspe ctions, inve stigate and punish the rectification i s not i n place, normal busine ss of running anti-polluti on installations do not. (Iii) linkage to pr omote flood control water, drainage, water supply, impr oving water savi ng. Speed up cross ang support river dike reinforcement, and along Pu seawall except insura nce reinforceme nt, and Lake Qian slui ce, and BA Cao sl uice, and cloud cover reservoir, focu s flood control drai nage e ngineering constr uction, vigor ously ously ously
ngineering, i ncreased geological disaster hidde n points gover nance efforts, solid advance small ba sin torrent disa ster governa nce, efforts from essentially sol ution basin sex, and regional flood control drainage capa city insufficient of pr obl m. Vigorously impleme nt the piers, algae and ot her water source s prote ction and, pr omoting rural drinking water safety proje cts, setting up water pricing reform and e nvironmental protecti on mechanism, gui ding water depth. Further soil poll ution a nd repair, strengthe n agricultural non-point source pollution preve ntion, mountain, water, forests, fields, lakes, various elements mut ual long. Four, manage t o tighten contrcontr e to sple to spl Baol ong , Secretary of provincial party Committee stressed t hat whilhat whil three to three to three to three to nue to catch on, a nd re solve a split ca nnot be changed. All localities and departments to departments to
unauna ated
2
目 录
1 项目概述........................................................................................................ 错误!未定义书签。
1.1 项目立项依据 ....................................................................................... 错误!未定义书签。
1.2 项目目标 ............................................................................................... 错误!未定义书签。
1.3 视频会议系统的构成 ........................................................................... 错误!未定义书签。
1.4 使用方式 .................................................................................................. 错误!未定义书签。
1. 5 系统拓扑图 ..................................................................................... 错误!未定义书签。
2 方案设计依据................................................................................................ 错误!未定义书签。
2.1
系统设计原则 ......................................................................................错误!未定义书签。
2.2
设备选型 .............................................................................................. 错误!未定义书签。
3 视频会议系统费用与实施进度安排 ............................................................ 错误!未定义书签。
3.1 设备功能对比 ....................................................................................... 错误!未定义书签。
3.2 设备接口对比 ....................................................................................... 错误!未定义书签。
3.3 设备价格对比 ....................................................................................... 错误!未定义书签。
3.5 其它设备 ............................................................................................... 错误!未定义书签。
3.6 进度安排 ............................................................................................... 错误!未定义书签。
4 视频会议系统会议室环境要求 .................................................................... 错误!未定义书签。
4.1 会议室的大小、布局与环境 ............................................................... 错误!未定义书签。
4.2
会议室的灯光 ......................................................................................错误!未定义书签。
4.3
会议室的声学要求 ..............................................................................错误!未定义书签。
4.4
会议室的供电系统 ..............................................................................错误!未定义书签。
4.5
会议室传输线路布置 ..........................................................................错误!未定义书签。
videoconference , Secretary of the provincial Committee of Xia Baolong stressed: this year is tong stressed: this year is tong stressed: this year is t outstanding issues, obviously wssues, obviously w of the year. The County's departments at all levels must firmly establish tnts at all levels must firmly establish t n development concept, convi nced that Castle i s not relaxed, always maintai ning strategic ability a nd strong determination to improve t he environment, consiste ntly playing wntly playing w ar, ever -higher levels of comprehensive well -of f society was built. (A) lay the sewage uphill battle. This year wuphill battle. This year w , up t, up t c objective grasp of pollution control that focus, wit h the focus on three thinghinghing ng the County created. Organizating the County created. Organizati ckck nspecti on, the County garbage River, blaon, the County garbage River, bla on, timely
rectification of problems found in pla ce firmly to prevent river polluti on rebound. In a ccorda nce nce nce nferior five water quality monitoring stations w ork this year to ensure the Eliminati on of 1 provi ncial contr ol, five wa ter quality secti on 3 munici palities controlled deteri oration, ensure the creation this year oration, ensure the creation this year cond, pay special attenti on to poll ution-cutting construction of nanotubes. Intercepting nanotubes are the basis of poll ution of water source engine ering, e ngineering, matter of success or failure of water manageme nt. Urban sewage treatment, to imprnt. Urban sewage treatment, to impr ccuracy, compliaccuracy, complia speed up the tow n's support network construction, is f ocusing on on on. Domestic sewage treatment in r ural areas, this year is the final ye ar of the three-year action, determination to fight and the mome ntum around, ending the battle on whi ch fully to
ensure the realizati on of all County 648 formed vi llage coverage. Also, be sure to attach importa nce to focus on rural domestic wastew ater treatment facility operation and management, e nsure that wastewater treatment facility up and runni ng, role play, avplay, av d, pay spe al attention to t he River Lake pond desilting operation. Provinces now have focused on pollution on on on Next, to jump-start an i nvestigation line touches w ork, implementation plan a ccordi ng to the priorities a nd the programme of work, in a ccorda nce nce detaile d clea ning, dredging pla n, pla nni ng ahea d of time clead of time clea ng to local conditions to do sl udge, promote scie ntific resource utilizati on of silt a nd mud. (B) the heavy regulati on of heavily poll uting industrie s. Polluti on of water must grab the source, wastewater is primarily the sour ce of backward
production capacity, increase the intensity of
-
treatment of heavily polluting industries. Accordi ng to municipal , and municipal g overnment depl oyment of seve n big n big ction ction ements to December 2016 end of Qia n, all included shut st opped elimi nated of enter prise al l shut stopped eli minated in pl ace ; June 30, 2017 Qia n, all included place regulation upgrade and aggl omeration restruct uring of enter prise by unified standard reg ulation in place, late not standard of enterprise are impleme ntation disconti nue d; June 30, 2018 Qian, all intends Park production of enterpri se relocation Park in pla ce, late not Park of are discontinued. In the process of renovation, wi ll focus on four aspects: to firmly close the high energy consumption and heavy polluti on, hopeless enterprise gover nance and pr oducti on li nes, eliminated a number of yearly emission intensity, low value -added pr oducts of ba ckward production capa city. Second, we must stri ctly enforce the spacehe space
environment access system, promoting industry a cce ss and envir onmental conditi ons of acce ss of enter prises to the Park , industrial park, in principle, no l onger the class on the new project. T hirdl y, promoting re placement and reconstr uction of heav ily polluting i ndustries, mergers and re organizations, g uide enterpri ses to e nergy conserv ation, recycling and low-car bon and clea n pr oduction, and improv e the level of green developme nt. Four to establish a long-term supervision mechanism, i ncrease the i ntensity of spe cial inspe ctions, inve stigate and punish t he rectificati on is not i n place, normal busine ss of running anti-pollution i nstallations do not. (Iii) linkage to pr omote flood control water, drainage, water supply, impr oving water savi ng. Speed up cross ang support river dike reinforcement, and along Pu seawall except insura nce reinforcement, and Lake Qian sluice, and BA Cao sluice , and cloud cover reservoir, focus flood control drai nage engineeri ng constructi on, vigor ously ously ously
ngineering, i ncreased geological disa ster hidden poi nts gover nance efforts, solid advance small ba sin torrent disaster governa nce , efforts from essentially sol ution basi n sex, and regional flood control drainage capa city insufficient of probl m. V igorously implement the piers, algae and other water source s prote ction and, promoting rural drinki ng water safety projects, setting up water prici ng reform and environmental pr otection mechani sm, guiding water depth. Further soil pollution a nd repair, strengthe n agricultural non-point source poll ution prevention, mountain, wate r, forests, fields, lakes, various elements mut ual long. Four, manage t o tighten contrcontr e to sple to spl Baolong , Secretary of pr ovincial party Committee stressed t hat whilhat whilhat whilhat whilhat whil nue to catch on, a nd re solve a split ca nnot be cha nged. All localities and departments to artments to
unauna ated
3
1 项目概述
1.1 项目立项依据
视频会议是通过通信网络把两个或多个地点的多媒体会议终端连接起来,在
其间传送各种图像、话音和数据信号,使出席会议者有亲临现场的感觉。视频会
议系统还应用于远程教育、远程医疗等需要传送实时音频、视频和数据的业务。
信息技术的发展推动了视频会议技术的发展,美国“911”事件的之后,视频会
议系统得到迅速普及和大范围应用。
视频会议能为用户提供直接和实时的沟通交流,可节约会议时间和降低成
本。国内外很多科研机构和厂商都进行了多媒体多点会议通信系统的研究,并推
出了各自的视频会议系统。在研究各视频会议系统的基础上,国际电信联盟
(ITU-T)形成了视听多媒体通信系统国际标准的H.320及 H.323系列标准,使不
同厂商的多媒体通信产品能够互通,推动了多媒体通信技术标准化的进程。
xxxx 年 x 月,xx 公司已建成 100Mbps 宽带多业务计算机广域网,为数据
通信、视频会议等业务提供强有力的支持。
鉴于 xxxxxxxxxxxxx 的工作需求和 xxxxxx 公司的安排部署,提出本视频会
议系统的方案。
1.2 项目目标
按照 xxxx 公司视频会议的要求采用 H.323 IP 连接方式组成 H.323 标准视频
会议网,端口速率为 384kbps,可实现点对点会议、多点会议和会议数据共享,
建立基地和公寓的视频会议会场,使两个会场之间通过视频会议设备进行实时性
的视频和音频等信息的互通,达到节约会议时间,降低会议成本,提高会议人员
安全系数的目的。同时还要保证和 xxxxx 公司间的视频通讯。
1.3 视频会议系统的构成
视频会议系统简单的说是由视频会议终端+多点会议控制器 MCU+网络管理
软件+传输网络这四大部分构成。
由于用户已有的网络状况、硬件设施各有特色,所以对视频会议系统中视频
会议终端系统、多点会议控制器 MCU、网络管理软件等部分的要求,也各不一样。
主要的视频会议终端有三种:桌面型,机顶盒型,会议室型。
其中会议室型终端几乎提供了任何视频会议所需的解决方案,一般集成在一
剩余13页未读,继续阅读
资源评论
jane9872
- 粉丝: 106
- 资源: 7760
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功