没有合适的资源?快使用搜索试试~ 我知道了~
V400 installation guide
资源推荐
资源详情
资源评论
HP P10000 3PAR Storage System
Installation and Deinstallation Guide
Abstract
This guide describes the system hardware installation, software initialization, and deinstallation procedures for the HP P10000
3PAR Storage System. The installation of HP 3PAR equipment is to be performed by qualified technicians who are authorized
by HP to install storage systems and their hardware components. Authorized technicians include HP service engineers, Value
Added Resellers (VARs), certified self-maintaining customers, and authorized third-party field technicians.
HP Part Number: QL226-96582
Published: June 2012
© Copyright 2012 Hewlett-Packard Development Company, L.P.
The information contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express
warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall
not be liable for technical or editorial errors or omissions contained herein.
Acknowledgements
Intel, Itanium, Pentium, Intel Inside, and the Intel Inside logo are trademarks or registered trademarks of Intel Corporation or its subsidiaries in the
United States and other countries.
Microsoft, Windows, XP, and Windows NT are U.S. registered trademarks of Microsoft Corporation.
Adobe® and Acrobat® are trademarks of Adobe Systems Incorporated.
Java and Oracle are registered trademarks of Oracle and/or its affiliates.
UNIX® is a registered trademark of The Open Group.
Intel®, Itanium®, Pentium®, Intel Inside®, and the Intel Inside logo are trademarks or registered trademarks of Intel Corporation or its subsidiaries
in the United States and other countries.
WARRANTY STATEMENT:
To obtain a copy of the warranty for this product, see the warranty information website: http://www.hp.com/go/storagewarranty
Documentation
For the latest version of this document, go to the Services Access Workbench at http://sawpro.atlanta.hp.com/km/saw/pmBrowse.do?oid=5044215.
Contents
1 Introduction...............................................................................................7
Related Documentation..............................................................................................................7
Typographical Conventions........................................................................................................7
Advisories................................................................................................................................8
I Preinstallation..............................................................................................9
2 Preparing for Storage System Installation..................................................11
Preinstallation Planning.......................................................................................................11
Configuration Planning.......................................................................................................11
Planning Network Access....................................................................................................11
Supported Network Topologies.......................................................................................12
Shared....................................................................................................................12
Private....................................................................................................................12
Service Processor Connectivity........................................................................................13
Meeting System Requirements..............................................................................................14
Management Workstations.............................................................................................14
Providing for Service Access................................................................................................14
Meeting Structural Requirements..........................................................................................15
Weight and Pressure Loads.............................................................................................15
Raised Floor Requirements..............................................................................................15
Tile Cutout Specifications................................................................................................16
Meeting Electrical Requirements...........................................................................................17
Supporting Redundant Power..........................................................................................18
Meeting Environmental Specifications...................................................................................22
3 Storage System Physical Layout and Numbering........................................24
Identifying Storage System Components................................................................................24
Service Processor Placement................................................................................................25
Understanding Component Numbering.................................................................................26
Cabinet Numbering......................................................................................................26
Power Distribution Unit Numbering..................................................................................26
Fan Module Numbering.................................................................................................28
Battery Module Numbering............................................................................................30
Controller Node Numbering...........................................................................................32
Drive Chassis Numbering...............................................................................................34
Drive Magazine Allocation........................................................................................36
Power Supply Numbering...............................................................................................37
II Installation...............................................................................................39
4 Setting Up the Storage System................................................................42
Collecting the Necessary Tools............................................................................................42
Locating the Wrist Grounding Strap......................................................................................42
Unpacking the Cabinet.......................................................................................................42
Placing the Storage System..................................................................................................48
Removing the Front Security Door.........................................................................................49
Removing the Rear Security Door.........................................................................................51
Removing Side Panels.........................................................................................................53
Adjusting Power Cables......................................................................................................54
5 Installing the Drive Magazines................................................................58
Preparing to Install Drive Magazines....................................................................................58
Handling the Drive Magazines............................................................................................58
Contents 3
Drive Chassis Placement and Numbering..............................................................................58
Unpacking and Inserting the Drive Magazines.......................................................................59
Unpacking Drive Magazines..........................................................................................59
Drive Magazine Loading Pattern.....................................................................................60
Inserting the Drive Magazines.........................................................................................61
Installing Drive Cage Filler Panels.........................................................................................63
Cabling Drive Chassis........................................................................................................64
6 Checks and Setup before Powering On the Storage System........................67
Checking Redundant Power.................................................................................................67
Checking Power Cord Connections.......................................................................................67
AC Cord Connections....................................................................................................67
Connecting the Main Power Cords.......................................................................................70
Positioning the Storage system.............................................................................................72
Installing the Rear Door..................................................................................................72
Installing the Side and Filler Panels..................................................................................74
Securing the Storage system...........................................................................................75
Verifying Acclimatization.....................................................................................................76
Completing the Power-On Sequence.....................................................................................76
7 Understanding HP P10000 3PAR Storage System LED Status......................77
Drive Cage LEDs................................................................................................................77
DC4 Drive Cage FC-AL Module LEDs...............................................................................77
Drive Magazine LEDs....................................................................................................79
Controller Node LEDs.........................................................................................................80
Controller Node Status Panel LEDs...................................................................................81
Fan Module LEDs...............................................................................................................82
Fibre Channel Adapter Port LEDs..........................................................................................83
CNA Port LEDs..................................................................................................................83
Ethernet LEDs....................................................................................................................84
Power Supply LEDs.............................................................................................................85
Drive Chassis Power Supply LEDs....................................................................................85
Controller Node Power Supply LEDs................................................................................86
Battery Module LEDs..........................................................................................................87
Power Distribution Unit Lamps..............................................................................................87
Service Processor LEDs.......................................................................................................88
8 Initializing the Storage System Software...................................................90
Preparing for System Software Setup....................................................................................90
Collecting Necessary Information....................................................................................90
Setting Up the Storage system..............................................................................................90
Storage system Out-of-the-Box Script................................................................................90
Setting up the Service Processor...........................................................................................96
Service Processor Moment of Birth...................................................................................96
High Speed Setup....................................................................................................97
Configuring the SP With SP Mode.........................................................................97
Configuring the SP With Secure Network Mode.....................................................103
Mixed Connectivity Setup........................................................................................112
Secure Site Setup...................................................................................................118
Installing HP 3PAR InForm OS Files................................................................................124
Adding a Storage System to the Service Processor...........................................................125
Adding Workstations to the Public Firewall Rules.............................................................127
Exporting Test LUNs.........................................................................................................128
Defining Hosts............................................................................................................128
Creating and Exporting Test Volumes.............................................................................129
System Administrator Training............................................................................................130
4 Contents
III Deinstallation........................................................................................131
9 Deinstalling the Storage System............................................................133
Preparing for deinstallation...............................................................................................133
Storage System Inventory..............................................................................................133
Deinstalling the Storage system..........................................................................................134
Packing the Cabinet....................................................................................................139
IV Appendices..........................................................................................145
A Regulatory compliance notices.............................................................148
Regulatory compliance identification numbers......................................................................148
Federal Communications Commission notice........................................................................148
FCC rating label.........................................................................................................148
Class A equipment.................................................................................................148
Class B equipment..................................................................................................148
Declaration of Conformity for products marked with the FCC logo, United States only..........149
Modification...............................................................................................................149
Cables.......................................................................................................................149
Canadian notice (Avis Canadien)......................................................................................149
Class A equipment......................................................................................................149
Class B equipment......................................................................................................149
European Union notice.....................................................................................................149
Japanese notices..............................................................................................................150
Japanese VCCI-A notice...............................................................................................150
Japanese VCCI-B notice...............................................................................................150
Japanese VCCI marking...............................................................................................150
Japanese power cord statement....................................................................................150
Korean notices.................................................................................................................150
Class A equipment......................................................................................................150
Class B equipment......................................................................................................150
Taiwanese notices............................................................................................................151
BSMI Class A notice....................................................................................................151
Taiwan battery recycle statement...................................................................................151
Turkish recycling notice.....................................................................................................151
Vietnamese Information Technology and Communications compliance marking........................151
Recycling notices.............................................................................................................151
English recycling notice................................................................................................151
Bulgarian recycling notice............................................................................................152
Czech recycling notice.................................................................................................152
Danish recycling notice................................................................................................152
Dutch recycling notice..................................................................................................152
Estonian recycling notice..............................................................................................152
Finnish recycling notice................................................................................................153
French recycling notice.................................................................................................153
German recycling notice..............................................................................................153
Greek recycling notice.................................................................................................154
Hungarian recycling notice...........................................................................................154
Italian recycling notice.................................................................................................154
Latvian recycling notice................................................................................................154
Lithuanian recycling notice............................................................................................155
Polish recycling notice..................................................................................................155
Portuguese recycling notice...........................................................................................155
Romanian recycling notice............................................................................................155
Slovak recycling notice................................................................................................156
Spanish recycling notice...............................................................................................156
Contents 5
剩余195页未读,继续阅读
资源评论
ixora333
- 粉丝: 0
- 资源: 1
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
最新资源
- Screenshot_20240427_031602.jpg
- 网页PDF_2024年04月26日 23-46-14_QQ浏览器网页保存_QQ浏览器转格式(6).docx
- 直接插入排序,冒泡排序,直接选择排序.zip
- 在排序2的基础上,再次对快排进行优化,其次增加快排非递归,归并排序,归并排序非递归版.zip
- 实现了7种排序算法.三种复杂度排序.三种nlogn复杂度排序(堆排序,归并排序,快速排序)一种线性复杂度的排序.zip
- 冒泡排序 直接选择排序 直接插入排序 随机快速排序 归并排序 堆排序.zip
- 课设-内部排序算法比较 包括冒泡排序、直接插入排序、简单选择排序、快速排序、希尔排序、归并排序和堆排序.zip
- Python排序算法.zip
- C语言实现直接插入排序、希尔排序、选择排序、冒泡排序、堆排序、快速排序、归并排序、计数排序,并带图详解.zip
- 常用工具集参考用于图像等数据处理
资源上传下载、课程学习等过程中有任何疑问或建议,欢迎提出宝贵意见哦~我们会及时处理!
点击此处反馈
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功