Installation and Setup Guide
EMC Data Domain DD2500 System Installation
and Setup Guide
302-001-374
REV. 02
February, 2015
This document provides installation for the rack bracket and the DD2500 system and initial
configuration instructions.
l
Related documentation..............................................................................................2
l
Tools and supplies needed........................................................................................ 3
l
Safety information..................................................................................................... 3
l
Description of the system...........................................................................................4
l
Unpack the system.................................................................................................. 12
l
Install the rack brackets...........................................................................................12
l
Install the system in the rack....................................................................................16
l
Install the cable management arm (CMA)................................................................. 17
l
Install the bezel....................................................................................................... 19
l
Connect data cables................................................................................................ 19
l
Powering on the controller....................................................................................... 19
l
Enable administrative communication..................................................................... 20
l
End User License Agreement (EULA) ........................................................................ 20
l
Run the configuration wizard....................................................................................21
Related documentation
EMC provides a variety of document types to support our products. End-user documents
include user guides, hardware installation guides, administrator guides, software guides,
part replacement guides, release notes, and others. Integration documents describe how
to integrate Data Domain systems with third party backup applications, and compatibility
matrices show which components are compatible with each other.
This document refers to other EMC documents by title. To locate a referenced document,
go to the EMC Support website at https://support.emc.com, enter the document title in
the search box, and click the search button.
Note
Hard copies of a document may be out of date. Always check for the current version of a
document before you start an upgrade or begin a significant configuration change.
Viewing Data Domain documents
Procedure
1. Log into the EMC Online support site at: https://support.emc.com.
2. To view user documents, click Product Documentation and then perform the following
steps:
a. Select the Data Domain model from the Platform list and click View.
b. On the row for the correct Data Domain operating system (DD OS) version, click
View under Documentation.
c. Click the desired title.
3. To view integration-related documents, perform the following steps:
a. Click Integration Documentation.
b. Select the vendor from the Vendor dropdown list.
c. Select the desired title from the list.
4. To view compatibility matrices, perform the following steps:
a. Click Compatibility Matrices.
b. Select the desired title from the Current Releases list.
Where to go for more information
For information about:
Go to https://support.emc.com/
How to configure the system
EMC Data Domain Operating System Initial
Configuration Guide
New features, enhancements, known issues,
and late-breaking news about your Data
Domain software release
EMC Data Domain Operating System Release
Notes
for your software release
How to manage the Data Domain operating
system
EMC Data Domain Operating System
Administration Guide
for your software release
Installation and Setup Guide
2 Installation and Setup Guide
For information about: Go to https://support.emc.com/
How to install and use the DD Boost software
and plug-in
EMC Data Domain Boost for OpenStorage
Administration Guide
for your software release
How to replace Data Domain hardware
components
Specific part installation guides
How to use third-party applications Integration documentation and compatibility
matrices
Tools and supplies needed
For a list of recommended tools and supplies for field work, see the document titled
FE
Toolkit Inventory and Common Procedures for FRU Tasks
at https://support.emc.com.
Safety information
CAUTION
l
If the system is used in a manner not specified by the manufacturer, the protection
provided by the equipment may be impaired.
l
The RJ-45 sockets on the motherboard, PCI cards, or I/O modules are for Ethernet
connection only and must not be connected to a telecommunications network.
Review this list of important safety recommendations.
l
All plug-in modules and blank plates are part of the fire enclosure and must be
removed only when a replacement can be added immediately. The system must not
be run without all parts in place.
l
A controller must be operated only from a power supply input voltage range of 100–
240 VAC, 50–60 Hz.
l
Each component is intended to operate with all working power supplies installed.
l
Provide a suitable power source with electrical overload protection.
l
A safe electrical earth connection must be provided to each power cord. Check the
grounding of the power sources before applying power.
l
The plug on each power supply cord is used as the main disconnect device. Ensure
that the socket outlets are located near the equipment and are easily accessible.
l
Permanently unplug the unit if you think it is damaged in any way and before moving
it. If the unit is powered by multiple sources, disconnect all supplied power for
complete isolation.
l
The power connections must always be disconnected prior to removal or replacement
of a power supply module from any of the components in the system.
l
A faulty or failed fan module should be replaced as soon as possible. A faulty or
failed power supply module must be replaced within 24 hours.
l
EMC Data Domain systems are heavy. Use two people or a mechanical lift to move
any system.
l
To comply with applicable safety, emission, and thermal requirements, covers must
not be removed and all bays must be fitted with plug-in modules.
EMC Data Domain DD2500 System Installation and Setup Guide
Tools and supplies needed 3
l
Load the rack beginning at the bottom to prevent the rack from becoming top-heavy.
l
For ESD protection, EMC Data Domain recommends that you wear a suitable antistatic
wrist or ankle strap. Observe all conventional ESD precautions when handling plug-in
modules and components.
l
Do not extend components on slide rails until you have loaded at least three or more
similarly weighted items in the rack, or unless the rack is bolted to the floor or
overhead structure to prevent tipping.
Description of the system
This section includes site requirements, product specifications, and descriptions of front
and rear panels.
Site requirements
The site requirements are:
l
The system requires 2U of vertical space in a standard 19”, four-post rack. Do not use
a two-post rack.
l
Use air conditioning that can cope with the maximum BTU/hour thermal rating.
l
Temperature control required with a gradient (change) not to exceed 30° C in an hour.
l
In a closed or multi-unit rack, ensure that the unit has adequate airflow through the
front bezel and back panel and that ambient temperature requirements are met.
l
Ensure that the front bezel and back panel clearances are met.
l
Ensure that cables at rear of unit do not obstruct exhaust airflow.
l
If installing in a closed cabinet, ensure that the front and rear doors have at least
65% open area to ensure adequate airflow for cooling.
l
Front bezel requires 1.56 inches (4.0 cm) of unobstructed clearance.
l
Back panel requires 5 inches (12.7 cm) of unobstructed clearance.
l
AC power outlets must be provided with an earth ground conductor (safety ground). A
safe electrical earth connection must be provided to each power cord.
l
Required voltage: 100-120 V~ or 200-240 V~. Frequency: 50 to 60 Hz.
System specifications
Model
Watts BTU/
hour
Power (VA)
(120V/230V)
Size (U) Power
connectors
Weight Width Depth Height
DD2500
with 7
drives
394 1345 406 (3.38A/
1.76A)
2 2 x grounded,
120 VAC, NEMA
15P/R
65 lb. /
29.5 kg.
19 in. /
48.3 cm.
29.5 in. /
74.9 cm
3.5 in. /
8.9 cm.
DD2500
with 12
drives
487 1662 502 (4.18A/
2.18A)
2 2 x grounded,
120 VAC, NEMA
15P/R
73 lb. /
33.1 kg.
19 in. /
48.3 cm.
29.5 in. /
74.9 cm.
3.5 in. /
8.9 cm.
l
Operating temperature: 50° to 95° F (10° to 35° C), derate 1.1° C per 1000 feet,
above 7500 feet up to 10,000 feet.
l
Operating humidity: 20% to 80%, non-condensing.
Installation and Setup Guide
4 Installation and Setup Guide
l
Non-operating temperature: -40° to +149° F (-40° to +65° C).
l
Operating acoustic noise: Sound power, LWAd, is 7.52 bels. Sound pressure, LpAm,
is 56.4 dB. (Declared noise emission per ISO 9296.)
Storage capacity
The table lists the capacities of the DD2500 system. Data Domain system internal
indexes and other product components use variable amounts of storage, depending on
the type of data and the sizes of files. If you send different data sets to otherwise
identical systems, one system may, over time, have room for more or less actual backup
data than another.
Note
Data Domain system commands compute and display amounts of disk space or data as
decimal multiples of certain powers of two (2
10
, 2
20
, 2
30
, and so forth). For example, 7
GiB of disk space = 7 x 2
30
bytes = 7 x 1,073,741,824 bytes. EMC Data Domain refers to
this process as Base 2 calculation.
Table 1 DD2500 storage capacity
System/
Installed
Memory
Internal
Disks
Raw
Storage
(Base
10)
Data Storage
Space
(Base 2
Calculation)
Data Storage
Space
(Base 10
Calculation)
External Storage
DD2500
4 x 8 GB
DIMM
Seven or
twelve 3.5
in. 3 TB
SAS HDDs
21 TB or
36 TB
7 drives: 10671
GiB
7+5 drives:
18763 GiB
12 drives: 24334
GiB
7 drives:
11458 GiB
7+5 drives:
20147 GiB1
12 drives:
26129 GiB
1 x 30-TB SAS shelf;
up to 30 TB of raw
capacity.
DD2500
8 x 8 GB
DIMM
Seven or
twelve 3.5
in. 3 TB
SAS HDDs
21 TB or
36 TB
7 drives: 10671
GiB
7+5 drives:
18763 GiB
12 drives: 24334
GiB
7 drives:
11458 GiB
7+5 drives:
20147 GiB
12 drives:
26129 GiB
Up to a maximum of 4
x 30-TB SAS shelves
or 3 x 45-TB SAS
shelves; up to 135 TB
of raw capacity.
Note
For information about Data Domain expansion shelves, see the separate document,
EMC
Data Domain Expansion Shelf Hardware Guide
.
EMC Data Domain DD2500 System Installation and Setup Guide
Storage capacity 5
剩余24页未读,继续阅读
资源评论
hnlgxy020
- 粉丝: 0
- 资源: 1
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
最新资源
- 徐州市区shp边界文件
- 简易数字频率计设计(原理图、PCB、源码、分析报告)
- 20225207038罗丽文财管专2201班.rar
- Golang:通过Gin框架+Redis+责任链,实现一个简单的钉钉机器人,进行消息处理 ps:多应用版
- 基于cnn和AlexNet的铝材缺陷检测内含数据集和demo原型2种方法
- 2023年各城市PM2.5, PM10, SO2, NO2等环境空气质量数据
- go 语言 实现的 使用modbus 协议 通过DTU tcp 链接 采集数据
- SHELL脚本(全是干货)
- Windows屏幕录屏软件
- 2022年各城市PM2.5, PM10, SO2, NO2等环境空气质量数据
资源上传下载、课程学习等过程中有任何疑问或建议,欢迎提出宝贵意见哦~我们会及时处理!
点击此处反馈
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功