没有合适的资源?快使用搜索试试~ 我知道了~
ARIS METHOD Version 9.8 – Service Release 5 -269页

温馨提示
ARIS METHOD Version 9.8 – Service Release 5
资源推荐
资源详情
资源评论




























Version 9.8 – Service Release 5
ARIS
METHOD
June 2016

This document applies to ARIS Version 9.8 and to all subsequent releases. Specifications
contained herein are subject to change and these changes will be reported in subsequent release
notes or new editions.
Copyright © 2010
- 2016 Software AG, Darmstadt, Germany and/or Software AG USA Inc.,
Reston, VA, USA, and/or its subsidiaries and/or its affiliates and/or their licensors.
The name
Software AG and all Software AG product names are either trademarks or registered
trademarks of
Software AG and/or Software AG USA Inc. and/or its subsidiaries and/or its
affiliates and/or their licensors. Other company and product names mentioned herein may be
trademarks of their respective owners. Detailed information on trademarks and patents owned by
Software AG and/or its
subsidiaries is located at http://softwareag.com/licenses.
Use of this software is subject to adherence to Software AG's licensing conditions and terms.
These terms are part of the product documentation, located at http://softwareag.com/licenses
and/or in
the root installation directory of the licensed product(s).
This software may include portions of third
-party products. For third-party copyright notices,
license terms, additional rights or restrictions, please refer to "License Texts, Copyright Notices
and Disclaimers of Third Party Products". For certain specific third
-party license restrictions,
please refer to section E of the Legal Notices available under "License Terms and Conditions for
Use of Software AG Products / Copyright and Trademark Notices of Software AG Products". These
documents are part of the product documentation, located at
http://softwareag.com/licenses
and/or in the root installation directory of the licensed product(s).

I
METHOD
Contents
1 Introduction ......................................................................................................... 1
2 Architecture of Integrated Information Systems (ARIS) ............................................. 3
2.1 ARIS architecture concept............................................................................. 3
2.2 Descriptive views ......................................................................................... 3
2.3 Descriptive levels ........................................................................................ 7
3 Process chain analysis ......................................................................................... 11
3.1 Description of the business management problem ......................................... 11
3.2 Process chain diagram (PCD) ...................................................................... 12
4 Modeling within the views and levels of the ARIS concept ......................................... 14
4.1 Function view ............................................................................................ 14
4.1.1 Requirements definition ................................................................... 14
4.1.1.1 Function tree ............................................................................. 14
4.1.1.2 Y diagram ................................................................................. 19
4.1.1.3 SAP® applications diagram ......................................................... 20
4.1.1.4 Objective diagram ...................................................................... 20
4.1.2 Design specification - Application system type diagram ........................ 21
4.1.3 Implementation - Application system diagram .................................... 25
4.2 Data view ................................................................................................. 28
4.2.1 Requirements definition ................................................................... 28
4.2.1.1 The ERM base model .................................................................. 28
4.2.1.2 ERM - eERM extensions............................................................... 33
4.2.1.2.1 Design operators added ............................................................ 33
4.2.1.2.2 Extension of cardinalities .......................................................... 37
4.2.1.2.3 Identification and existence dependency ..................................... 39
4.2.1.2.4 Modeling technical terms used in a company - Technical terms
model .................................................................................... 40
4.2.1.2.5 eERM attribute allocation diagram ............................................. 41
4.2.1.3 Alternative forms of representation .............................................. 42
4.2.1.3.1 SAP® SERM ............................................................................ 42
4.2.1.3.2 IE data model ......................................................................... 44
4.2.1.3.3 SeDaM model .......................................................................... 44
4.2.1.4 Summary of the main terms and forms of representation of the
eERM ........................................................................................ 45
4.2.1.5 Document type definition ............................................................ 46
4.2.1.5.1 Element types ......................................................................... 46
4.2.1.5.2 Connection types ..................................................................... 48
4.2.1.5.3 Attribute types ........................................................................ 48
4.2.1.5.3.1 Data type of the attribute value ......................................... 49
4.2.1.5.3.2 Attribute default ............................................................... 50
4.2.1.5.4 Testing a DTD ......................................................................... 52
4.2.1.6 Material flow modeling - Material diagram ..................................... 53
4.2.1.7 Modeling the Data Warehouse structure ........................................ 54
4.2.1.8 Authorization hierarchy ............................................................... 55
4.2.1.9 Process cost management data models ......................................... 56
4.2.1.9.1 CD diagram ............................................................................ 56
4.2.1.9.2 Cost category diagram ............................................................. 57
4.2.1.10 Project management data model .................................................. 58

II
METHOD
4.2.1.10.1 Information carrier diagram ...................................................... 58
4.2.2 Design specification ......................................................................... 58
4.2.2.1 Relations diagram and Attribute allocation diagram ........................ 58
4.2.2.2 System interface models - System attributes, System attribute
domain ..................................................................................... 60
4.2.3 Implementation - Table diagram ....................................................... 62
4.3 Organization view ...................................................................................... 64
4.3.1 Requirements definition ................................................................... 64
4.3.1.1 Organizational structure of companies .......................................... 64
4.3.1.2 Organizational chart ................................................................... 66
4.3.1.3 Shift calendar ............................................................................ 70
4.3.2 Design specification - Network topology ............................................. 72
4.3.3 Implementation .............................................................................. 74
4.3.3.1 Network diagram ....................................................................... 74
4.3.3.2 Material flow modeling - Technical resources ................................. 76
4.4 Process view ............................................................................................. 78
4.4.1 Requirements definition ................................................................... 78
4.4.1.1 Linking functions with organization - EPC, Function/Organizational
level diagram ............................................................................ 78
4.4.1.2 Linking functions with data .......................................................... 80
4.4.1.2.1 Event control - Event-driven process chain (EPC) ........................ 80
4.4.1.2.2 Function allocation diagram (I/O) .............................................. 87
4.4.1.2.3 Information flow diagrams ........................................................ 91
4.4.1.2.4 Event diagram......................................................................... 92
4.4.1.3 Functions - Organization - Data ................................................... 93
4.4.1.3.1 EPC/PCD ................................................................................ 93
4.4.1.3.2 Input/Output diagram .............................................................. 94
4.4.1.3.3 Value-added chain diagram ....................................................... 95
4.4.1.3.4 Rule diagram .......................................................................... 96
4.4.1.3.5 Communications diagram ......................................................... 97
4.4.1.3.6 Classification diagram .............................................................. 97
4.4.1.4 Object-oriented modeling ............................................................ 97
4.4.1.5 Process variants ......................................................................... 97
4.4.1.5.1 Process selection matrix ........................................................... 97
4.4.1.6 Material flow modeling ................................................................ 98
4.4.1.6.1 EPC (material flow) .................................................................. 98
4.4.1.6.2 Material flow diagram .............................................................. 100
4.4.1.6.3 EPC (column/row display) ........................................................ 100
4.4.1.7 SAP ALE models ........................................................................ 101
4.4.1.7.1 SAP ALE filter model ............................................................... 101
4.4.1.7.2 SAP ALE message flow model ................................................... 101
4.4.1.7.3 SAP ALE message type model .................................................. 101
4.4.1.8 Role assignment diagram (RAD) ................................................. 102
4.4.1.9 Other models ........................................................................... 103
4.4.1.9.1 Business controls diagram ....................................................... 103
4.4.1.9.2 DW transformation ................................................................. 104
4.4.1.9.3 E-Business scenario diagram .................................................... 105
4.4.1.9.4 Structuring model ................................................................... 107
4.4.1.9.5 Industrial process and Office process ........................................ 107
4.4.1.9.6 Project process chain (PPC) ..................................................... 108

III
METHOD
4.4.1.9.7 Process instantiation model...................................................... 110
4.4.1.9.8 RAMS .................................................................................... 111
4.4.1.9.9 Role diagram ......................................................................... 112
4.4.1.9.10 Quick model ........................................................................... 113
4.4.1.9.11 c3 method ............................................................................. 114
4.4.1.9.12 Screen design ........................................................................ 115
4.4.1.9.13 Screen navigation ................................................................... 117
4.4.1.9.14 Business segment matrix ......................................................... 118
4.4.2 Design specification ........................................................................ 120
4.4.2.1 Access diagram ......................................................................... 120
4.4.2.1.1 Linking functions with data ...................................................... 120
4.4.2.1.2 Linking organization with data .................................................. 121
4.4.2.1.3 Linking organization with function ............................................. 122
4.4.2.2 Program flow chart .................................................................... 123
4.4.2.3 Program flow chart (PF) ............................................................. 124
4.4.2.4 Screen diagram ........................................................................ 125
4.4.2.5 SAP integration process (XI) ....................................................... 127
4.4.3 Implementation - Access diagram (physical)...................................... 128
4.4.3.1 Linking functions with data ......................................................... 128
4.4.3.2 Linking organization with data .................................................... 129
4.4.3.3 Linking organization with functions .............................................. 130
4.5 Product/Service modeling .......................................................................... 132
4.5.1 Product/Service exchange diagram ................................................... 132
4.5.2 Product/Service tree ....................................................................... 133
4.5.3 Product allocation diagram .............................................................. 135
4.5.4 Product tree .................................................................................. 137
4.5.5 Product selection matrix .................................................................. 137
4.5.6 Competition model ......................................................................... 138
5 Unified Modeling Language (UML) in ARIS ............................................................. 139
5.1 Introduction ............................................................................................. 139
5.2 ARIS UML Designer - Supported UML standard ............................................. 139
6 Object Modeling Technique (OMT) ........................................................................ 140
6.1 Introduction ............................................................................................. 140
6.2 Summary of the OMT methodology ............................................................. 140
6.3 Object modeling techniques in ARIS ............................................................ 141
6.3.1 OMT Object model .......................................................................... 141
6.3.2 OMT Dynamic model ....................................................................... 148
6.3.3 OMT Functional model .................................................................... 150
6.3.4 How to arrange objects in a hierarchy ............................................... 153
7 Methods for knowledge management .................................................................... 154
7.1 Introduction ............................................................................................. 154
7.2 Object types for modeling knowledge processing .......................................... 155
7.2.1 Knowledge category ....................................................................... 155
7.2.2 Documented knowledge .................................................................. 157
7.3 Model types for modeling knowledge processing ........................................... 158
7.3.1 Knowledge structure diagram .......................................................... 158
7.3.2 Knowledge map ............................................................................. 159
7.3.3 Representation of knowledge processing in business processes ............ 161
剩余268页未读,继续阅读
资源评论

- qq_19067309_zj2023-05-21ARIS METHOD Version 9.8 – Service Release 5 -269页 #内容与标题一致

weixin_40191861_zj
- 粉丝: 90
- 资源: 1万+
上传资源 快速赚钱
我的内容管理 展开
我的资源 快来上传第一个资源
我的收益
登录查看自己的收益我的积分 登录查看自己的积分
我的C币 登录后查看C币余额
我的收藏
我的下载
下载帮助


最新资源
- ShellTransition学习笔记
- 5G+AI智慧高校大数据顶层规划设计及应用方案(67页PPT).pptx
- 基于PWM的 三色灯RGB模块调色 标准库 代码
- 基于Simulink仿真的光储并网直流微电网模型研究:MPPT最大功率输出与混合储能系统的协同优化,基于Simulink仿真的光储并网直流微电网模型研究:MPPT最大功率输出与混合储能系统的协同优化
- JAVA实现有趣的迷宫小游戏(附源码).zip
- 基于NRBO-Transformer-BILSTM的深度学习模型:多特征分类预测与性能评估的Matlab实现,基于NRBO-Transformer-BILSTM的多特征分类预测模型与性能评估的Matl
- 磁链观测器在VESC中的应用方法及其代码、文档、仿真模型的对应关系以及附送翻译的Lawicel CANUSB驱动,磁链观测器在VESC中的应用:实现0速闭环启动,代码、文档、仿真模型供学习,磁链观测器
- 基于多智能体一致性算法的电力系统分布式经济调度策略:迭代优化与仿真验证,基于多智能体一致性算法与迭代计算的电力系统分布式经济优化调度策略(MATLAB实现),MATLAB代码基于多智能体系统一致性算
- 2013.8.5-2025.3.5碳排放权交易数据(日度).xlsx
- 中断上下文详细解析PDF详细内容
- VC-redist.x64-14.42.34438.0.7z
- MATLAB实现基于BiGRU-AdaBoost双向门控循环单元结合AdaBoost多输入分类预测(含模型描述及示例代码)
- Matlab实现KOA-CNN-GRU-selfAttention多特征分类预测(自注意力机制)(含模型描述及示例代码)
- MATLAB实现SSA-CNN-BiLSTM-Attention多变量时间序列预测(SE注意力机制)(含模型描述及示例代码)
- 基于磁耦合谐振的无线电能传输设计:MATLAB仿真中的PWM控制与过零检测模块探讨及二极管与同步整流技术的结合应用 ,基于Matlab Simulink仿真的无线电能传输设计:磁耦合谐振与PWM MO
- 博图16立体车库控制系统:PLC运行效果视频展示与接线图详解,深度解析:4x5立体车库控制系统的博图16版本,含PLC运行效果视频、详细接线图及IO表,4x5立体车库控制系统 博图16 带PLC运行效
资源上传下载、课程学习等过程中有任何疑问或建议,欢迎提出宝贵意见哦~我们会及时处理!
点击此处反馈



安全验证
文档复制为VIP权益,开通VIP直接复制
