没有合适的资源?快使用搜索试试~ 我知道了~
200-测试试卷-软件项目管理1
需积分: 0 0 下载量 179 浏览量
2022-08-04
13:16:25
上传
评论
收藏 111KB PDF 举报
温馨提示
试读
2页
200-测试试卷-软件项目管理1
资源详情
资源评论
资源推荐
选择题
1
)
What are not the elements that are present in every computer-based system?
(A) people (B) software (C) product (D) documentation (E) project
2
)
Which factors are important when choosing a project team leader?
(A) managerial identity (B) ability of communicating to other people
(C) problem solving ability (D) outstanding programming ability
3
)
Which of these are valid software configuration items?
(A) case tools (B) executable programs (C) test data (D) documentation
4
)
Which factors are important when choosing a project team leader?
(A) managerial identity (B) outstanding programming ability
(C) problem solving ability (D) ability of communicating to other people
5
)
How does a software project manager need to act to minimize the risk of software failure?
A) double the project team size
B) request a large budget
C) start on the right foot
D) track progress
9
)
Which of the following tasks are part of software configuration management?
A) change control
B) statistical quality control
C) reporting
D) version control
判断题
1)
维护软件文档与维护可执行代码同等重要。 ( )
2)
Sales people is a key player in the software process. ( )
3) Project management is less important for modern software development since most projects
are successful and completed on time.
4) Software configuration includes all information produced as part of the software process, such
as programs, documents, data, and possibly some developing tools.
5) A good software is flexible, so it can easily accommodate changes brought up with the
requirement change.
6) Once a software engineering work product becomes a baseline it can not be changed again.
7)
CD and CC team structure can be successfully applied to simple problems, but DD structure is
best for difficult problems.
8) Customers, end-users, practitioners, project managers and sales people are all considered as
players in the software process.
9)
A stakeholder is anyone who will purchase the completed software system under
development.
10)
The best person to hire as a project team leader is the most competent software engineering
practitioner available.
仙夜子
- 粉丝: 35
- 资源: 325
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功
评论0