没有合适的资源?快使用搜索试试~ 我知道了~
ETSI EN301893
5星 · 超过95%的资源 需积分: 30 22 下载量 7 浏览量
2013-07-18
17:00:07
上传
评论 1
收藏 1.37MB PDF 举报
温馨提示
试读
90页
CE wifi EMI test standard. CE EMI測試準則
资源推荐
资源详情
资源评论
Final draft ETSI EN 301 893 V1.7.0 (2012-01)
Broadband Radio Access Networks (
BRAN
);
5 GHz high performance RLAN;
Harmonized EN covering the essential requirements
of article 3.2 of the R&TTE Directive
Harmonized European Standard
ETSI
Final draft ETSI EN 301
893 V1.7.0 (2012
-
01)
2
Reference
REN/BRAN-0060009
Keywords
access, broadband, LAN, layer 1, radio,
regulation, testing
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88
Important notice
Individual copies of the present document can be downloaded from:
http://www.etsi.org
The present document may be made available in more than one electronic version or in print. In any case of existing or
perceived difference in contents between such versions, the reference version is the Portable Document Format (PDF).
In case of dispute, the reference shall be the printing on
ETSI printers of the PDF version kept on a specific network drive
within ETSI Secretariat.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
http://portal.etsi.org/tb/status/status.asp
If you find errors in the present document, please send your comment to one of the following services:
http://portal.etsi.org/chaircor/ETSI_support.asp
Copyright Notification
No part may be reproduced except as authorized by written permission.
The copyright and the foregoing restriction extend to reproduction in all media.
© European Telecommunications Standards Institute 2012.
All rights reserved.
DECT
TM
, PLUGTESTS
TM
, UMTS
TM
and the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members.
3GPP
TM
and LTE™ are Trade Marks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
GSM® and the GSM logo are Trade Marks registered and owned by the GSM Association.
ETSI
Final draft ETSI EN 301 893 V1.7.0 (2012
-
01)
3
Contents
Intellectual Property Rights ................................................................................................................................ 7
Foreword ............................................................................................................................................................. 7
Introduction ........................................................................................................................................................ 7
1 Scope ........................................................................................................................................................ 8
2 References ................................................................................................................................................ 8
2.1 Normative references ......................................................................................................................................... 8
2.2 Informative references ........................................................................................................................................ 9
3 Definitions, symbols and abbreviations ................................................................................................... 9
3.1 Definitions .......................................................................................................................................................... 9
3.2 Symbols ............................................................................................................................................................ 12
3.3 Abbreviations ................................................................................................................................................... 13
4 Technical requirements specifications ................................................................................................... 13
4.1 Environmental profile ....................................................................................................................................... 13
4.2 Centre frequencies ............................................................................................................................................ 13
4.2.1 Definition .................................................................................................................................................... 14
4.2.2 Limits .......................................................................................................................................................... 14
4.2.3 Conformance............................................................................................................................................... 14
4.3 Nominal Channel Bandwidth and Occupied Channel Bandwidth .................................................................... 14
4.3.1 Definition .................................................................................................................................................... 14
4.3.2 Limits .......................................................................................................................................................... 14
4.3.3 Conformance............................................................................................................................................... 14
4.4 RF output power, Transmit Power Control (TPC) and power density ............................................................. 14
4.4.1 Definitions .................................................................................................................................................. 14
4.4.1.1 RF Output Power .................................................................................................................................. 14
4.4.1.2 Transmit Power Control (TPC) ............................................................................................................. 15
4.4.1.3 Power Density ....................................................................................................................................... 15
4.4.2 Limits .......................................................................................................................................................... 15
4.4.2.1 RF output power and power density at the highest power level ............................................................ 15
4.4.2.2 RF output power at the lowest power level of the TPC range ............................................................... 15
4.4.3 Conformance............................................................................................................................................... 16
4.5 Transmitter unwanted emissions ...................................................................................................................... 16
4.5.1 Transmitter unwanted emissions outside the 5 GHz RLAN bands ............................................................. 16
4.5.1.1 Definition .............................................................................................................................................. 16
4.5.1.2 Limits .................................................................................................................................................... 16
4.5.1.3 Conformance ......................................................................................................................................... 16
4.5.2 Transmitter unwanted emissions within the 5 GHz RLAN bands .............................................................. 16
4.5.2.1 Definition .............................................................................................................................................. 16
4.5.2.2 Limits .................................................................................................................................................... 17
4.5.2.3 Conformance ......................................................................................................................................... 17
4.6 Receiver spurious emissions............................................................................................................................. 17
4.6.1 Definition .................................................................................................................................................... 17
4.6.2 Limits .......................................................................................................................................................... 18
4.6.3 Conformance............................................................................................................................................... 18
4.7 Dynamic Frequency Selection (DFS) ............................................................................................................... 18
4.7.1 Introduction................................................................................................................................................. 18
4.7.1.1 Applicable frequency range .................................................................................................................. 18
4.7.1.2 DFS operational modes ......................................................................................................................... 18
4.7.1.3 DFS operation ....................................................................................................................................... 19
4.7.2 DFS technical requirements specifications ................................................................................................. 20
4.7.2.1 Channel Availability Check .................................................................................................................. 20
4.7.2.1.1 Definition......................................................................................................................................... 20
4.7.2.1.2 Limit ................................................................................................................................................ 20
4.7.2.1.3 Conformance ................................................................................................................................... 20
ETSI
Final draft ETSI EN 301 893 V1.7.0 (2012
-
01)
4
4.7.2.2 Off-Channel CAC (Off-Channel Channel Availability Check) (optional) ............................................ 21
4.7.2.2.1 Definition......................................................................................................................................... 21
4.7.2.2.2 Limit ................................................................................................................................................ 21
4.7.2.2.3 Conformance ................................................................................................................................... 21
4.7.2.3 In-Service Monitoring ........................................................................................................................... 21
4.7.2.3.1 Definition......................................................................................................................................... 21
4.7.2.3.2 Limit ................................................................................................................................................ 21
4.7.2.3.3 Conformance ................................................................................................................................... 21
4.7.2.4 Channel Shutdown ................................................................................................................................ 21
4.7.2.4.1 Definition......................................................................................................................................... 21
4.7.2.4.2 Limit ................................................................................................................................................ 22
4.7.2.4.3 Conformance ................................................................................................................................... 22
4.7.2.5 Non-Occupancy Period ......................................................................................................................... 22
4.7.2.5.1 Definition......................................................................................................................................... 22
4.7.2.5.2 Limit ................................................................................................................................................ 22
4.7.2.5.3 Conformance ................................................................................................................................... 22
4.7.2.6 Uniform Spreading ................................................................................................................................ 22
4.7.2.6.1 Definition......................................................................................................................................... 22
4.7.2.6.2 Limit ................................................................................................................................................ 23
4.8 Void .................................................................................................................................................................. 23
4.9 Adaptivity (Channel Access Mechanism) ........................................................................................................ 23
4.9.1 Definition .................................................................................................................................................... 23
4.9.2 Requirements & limits ................................................................................................................................ 23
4.9.2.1 Frame Based Equipment ....................................................................................................................... 23
4.9.2.2 Load Based Equipment ......................................................................................................................... 24
4.9.2.3 Short Control Signalling Transmissions................................................................................................ 25
4.9.2.3.1 Definition......................................................................................................................................... 25
4.9.2.3.2 Limits .............................................................................................................................................. 25
4.9.3 Conformance............................................................................................................................................... 25
4.10 User Access Restrictions .................................................................................................................................. 26
4.10.1 Definition .................................................................................................................................................... 26
4.10.2 Requirement ................................................................................................................................................ 26
5 Testing for compliance with technical requirements .............................................................................. 26
5.1 Conditions for testing ....................................................................................................................................... 26
5.1.1 Normal and extreme test conditions............................................................................................................ 26
5.1.2 Test sequences and traffic load ................................................................................................................... 26
5.1.2.1 General test transmission sequences ..................................................................................................... 26
5.1.2.2 Test transmission sequences for DFS tests ............................................................................................ 27
5.1.3 Test channels .............................................................................................................................................. 27
5.1.4 Antennas ..................................................................................................................................................... 28
5.1.4.1 Integrated and dedicated antennas ......................................................................................................... 28
5.1.4.2 Transmit operating modes ..................................................................................................................... 28
5.1.4.2.1 Operating mode 1 (single antenna) .................................................................................................. 28
5.1.4.2.2 Operating mode 2 (multiple antennas, no beamforming) ................................................................ 28
5.1.4.2.3 Operating mode 3 (multiple antennas, with beamforming) ............................................................. 28
5.1.5 Presentation of equipment .......................................................................................................................... 28
5.1.5.1 Testing of host connected equipment and plug-in radio devices ........................................................... 28
5.1.5.1.1 The use of a host or test jig for testing plug-in radio devices .......................................................... 29
5.1.5.1.2 Testing of combinations .................................................................................................................. 29
5.2 Interpretation of the measurement results ........................................................................................................ 30
5.3 Essential radio test suites .................................................................................................................................. 30
5.3.1 Product information .................................................................................................................................... 30
5.3.2 Carrier frequencies ...................................................................................................................................... 32
5.3.2.1 Test conditions ...................................................................................................................................... 32
5.3.2.2 Test methods ......................................................................................................................................... 32
5.3.2.2.1 Conducted measurement.................................................................................................................. 32
5.3.2.2.2 Radiated measurement ..................................................................................................................... 33
5.3.3 Occupied Channel Bandwidth .................................................................................................................... 33
5.3.3.1 Test conditions ...................................................................................................................................... 33
5.3.3.2 Test method ........................................................................................................................................... 33
5.3.3.2.1 Conducted measurement.................................................................................................................. 33
ETSI
Fina
l draft ETSI EN 301 893 V1.7.0 (2012
-
01)
5
5.3.3.2.2 Radiated measurement ..................................................................................................................... 34
5.3.4 RF output power, Transmit Power Control (TPC) and power density ........................................................ 34
5.3.4.1 Test conditions ...................................................................................................................................... 34
5.3.4.2 Test method ........................................................................................................................................... 34
5.3.4.2.1 Conducted measurement.................................................................................................................. 34
5.3.4.2.2 Radiated measurement ..................................................................................................................... 43
5.3.5 Transmitter unwanted emissions outside the 5 GHz RLAN bands ............................................................. 44
5.3.5.1 Test conditions ...................................................................................................................................... 44
5.3.5.2 Test method ........................................................................................................................................... 44
5.3.5.2.1 Conducted measurement.................................................................................................................. 44
5.3.5.2.2 Radiated measurement ..................................................................................................................... 47
5.3.6 Transmitter unwanted emissions within the 5 GHz RLAN bands .............................................................. 47
5.3.6.1 Test conditions ...................................................................................................................................... 47
5.3.6.2 Test method ........................................................................................................................................... 47
5.3.6.2.1 Conducted measurement.................................................................................................................. 47
5.3.6.2.2 Radiated measurement ..................................................................................................................... 48
5.3.7 Receiver spurious emissions ....................................................................................................................... 48
5.3.7.1 Test conditions ...................................................................................................................................... 48
5.3.7.2 Test method ........................................................................................................................................... 49
5.3.7.2.1 Conducted measurement.................................................................................................................. 49
5.3.7.2.2 Radiated measurement ..................................................................................................................... 50
5.3.8 Dynamic Frequency Selection (DFS) ......................................................................................................... 50
5.3.8.1 Test conditions ...................................................................................................................................... 50
5.3.8.1.1 Selection of radar test signals .......................................................................................................... 50
5.3.8.1.2 Test set-ups ...................................................................................................................................... 51
5.3.8.2 Test method ........................................................................................................................................... 52
5.3.8.2.1 Conducted measurement.................................................................................................................. 52
5.3.8.2.2 Radiated measurement ..................................................................................................................... 60
5.3.9 Adaptivity (channel access mechanism) ..................................................................................................... 60
5.3.9.1 Test conditions ...................................................................................................................................... 60
5.3.9.2 Test method ........................................................................................................................................... 60
5.3.9.2.1 Conducted measurements ................................................................................................................ 60
5.3.9.2.2 Generic test procedure for measuring channel/frequency usage ..................................................... 62
5.3.9.2.3 Radiated measurements ................................................................................................................... 63
Annex A (normative): HS Requirements and conformance Test specifications Table
(HS-RTT) ........................................................................................................ 64
Annex B (normative): Test sites and arrangements for radiated measurements ........................... 66
B.1 Test sites ................................................................................................................................................. 66
B.1.1 Open air test sites ............................................................................................................................................. 66
B.1.2 Anechoic chamber ............................................................................................................................................ 67
B.1.2.1 General ........................................................................................................................................................ 67
B.1.2.2 Description .................................................................................................................................................. 67
B.1.2.3 Influence of parasitic reflections ................................................................................................................. 67
B.1.2.4 Calibration and mode of use ....................................................................................................................... 67
B.2 Test antenna ............................................................................................................................................ 69
B.3 Substitution antenna ............................................................................................................................... 69
Annex C (normative): General description of measurement ........................................................... 70
C.1 Conducted measurements ....................................................................................................................... 70
C.2 Radiated measurements .......................................................................................................................... 70
C.3 Substitution measurement ...................................................................................................................... 71
Annex D (normative): DFS parameters ............................................................................................. 72
Annex E (informative): Guidance for testing IEEE 802.11n™ Devices ............................................ 76
E.1 Introduction ............................................................................................................................................ 76
剩余89页未读,继续阅读
资源评论
- mayzie2015-01-01这个是ETSI EN 301 893 V1.7.0版本,不是最新的V1.7.1,不知道有没有V1.7.1。不过比没有强,找的挺辛苦,谢谢楼主分享。
- booboo492013-08-05对我来说非常有用,谢谢分享,初学中,正要找原档
- 我的地盘由我做主2013-12-17非常有用,谢谢分享原档2010版本
u011444198
- 粉丝: 0
- 资源: 3
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
最新资源
- BLOCK_TYPE_HEARTBEAT_D70A3465D4EE4E9_046141_dump_1st.dmp
- 项目方法测试调用接口工具
- studyupdate
- 基于西瓜数据集的决策树实现.zip
- 60套HTML网站源码-响应式-涵盖(简历&作品展示&商业&科技&培训&商城&课设等)-适配移动设备-解压即用.zip
- 贪心算法要点和难点实例代码解析
- 65套HTML网站源码-响应式-涵盖(简历&作品展示&商业&科技&培训&商城&课设等)-适配移动设备-解压即用.zip
- 多因素决策树的Python实现.zip
- 使用Python在莺尾花数据集上实现了决策树算法,文件里有数据集.zip
- python实现决策树.zip
资源上传下载、课程学习等过程中有任何疑问或建议,欢迎提出宝贵意见哦~我们会及时处理!
点击此处反馈
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功