没有合适的资源?快使用搜索试试~ 我知道了~
【船级社】 NK Rules for Marine Pollution Prevention Systems 2023.pdf
1.该资源内容由用户上传,如若侵权请联系客服进行举报
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
2.虚拟产品一经售出概不退款(资源遇到问题,请及时私信上传者)
版权申诉
0 下载量 36 浏览量
2023-11-30
15:28:40
上传
评论
收藏 5.49MB PDF 举报
温馨提示
试读
283页
【船级社】 NK Rules for Marine Pollution Prevention Systems 2023.pdf
资源推荐
资源详情
资源评论
RULES FOR MARINE POLLUTION PREVENTION SYSTEMS
CONTENTS
Part 1
GENERAL
Chapter 1
GENERAL
.............................................................................................................................................................
1
1.1 General
.........................................................................................................................................................................
1
Chapter 2
TERMINOLOGY AND ABBREVIATIONS
......................................................................................................
4
2.1 General
.........................................................................................................................................................................
4
Part 2
SURVEYS
Chapter 1
GENERAL
.............................................................................................................................................................
6
1.1 General
.........................................................................................................................................................................
6
1.2 Preparation for Surveys and Others
.............................................................................................................................
8
1.3 Verification Survey of Certificates, etc.
.......................................................................................................................
9
Chapter 2
REGISTRATION SURVEYS
..............................................................................................................................
11
2.1 Registration Surveys during Construction
..................................................................................................................
11
2.2 Registration Surveys Not Built under the Survey
.......................................................................................................
19
Chapter 3
REGISTRATION MAINTENANCE SURVEYS
..............................................................................................
21
3.1 Annual Surveys
...........................................................................................................................................................
21
3.2 Intermediate Surveys
...................................................................................................................................................
23
3.3 Special Surveys
...........................................................................................................................................................
26
Chapter 4
OCCASIONAL SURVEYS
..................................................................................................................................
28
4.1 General
........................................................................................................................................................................
28
Part 3
CONSTRUCTION AND EQUIPMENT FOR THE PREVENTION OF
POLLUTION BY OIL
Chapter 1
GENERAL
............................................................................................................................................................
29
1.1 Application and Terminology
......................................................................................................................................
29
1.2 General Rules
..............................................................................................................................................................
30
Chapter 2
EQUIPMENT FOR THE PREVENTION OF POLLUTION BY OIL FROM MACHINERY SPACES
....
38
2.1 General
........................................................................................................................................................................
38
2.2 Storage and Discharge of Oil Residues (Sludge) (Regulations 12 and 13 of Annex I)
...............................................
38
2.3 Oily-water Separating Equipment, Oil Filtering System, Oil Discharge Monitoring and
Control System for Oily Bilge Water, and Oily Bilge Water Holding Tanks (Regulation 14 of Annex I)
..................
39
2.4 Requirements for Installation (Regulation 14 of Annex I)
..........................................................................................
41
Chapter 3
CONSTRUCTION AND EQUIPMENT FOR THE PREVENTION OF
POLLUTION BY OIL CARRIED IN BULK
....................................................................................................
42
3.1 General
........................................................................................................................................................................
42
3.2 Hull Construction
........................................................................................................................................................
42
3.3 Installations and Piping Arrangements
........................................................................................................................
57
3.4 Crude Oil Washing System
.........................................................................................................................................
59
Chapter 4
TRANSITIONAL REQUIREMENTS
................................................................................................................
62
4.1 General
........................................................................................................................................................................
62
4.2 General Requirements
.................................................................................................................................................
64
4.3 Equipment for the Prevention of Pollution by Oil Carried in Bulk by Oil Tankers
....................................................
64
I
Part 4
CONSTRUCTION AND EQUIPMENT FOR THE PREVENTION OF POLLUTION
BY DISCHARGES OF NOXIOUS LIQUID SUBSTANCES IN BULK
Chapter 1
GENERAL
............................................................................................................................................................
67
1.1 General
........................................................................................................................................................................
67
1.2 Definitions
...................................................................................................................................................................
67
Chapter 2
CONSTRUCTION AND EQUIPMENT
............................................................................................................
69
2.1 General
........................................................................................................................................................................
69
2.2 Requirements for Installation of Construction and Equipment
...................................................................................
69
Chapter 3
(Deleted)
.................................................................................................................................................................
71
Chapter 4
EQUIPMENT FOR THE PREVENTION OF DISCHARGE OF NOXIOUS
LIQUID SUBSTANCES
.......................................................................................................................................
72
4.1 General
........................................................................................................................................................................
72
4.2 Prewashing Systems (Regulation 6 of Annex II)
.........................................................................................................
72
4.3 Stripping System (Regulation 5 of Annex II)
..............................................................................................................
72
4.4 Discharge Arrangements below the Waterline
............................................................................................................
73
4.5 Arrangements for Discharge to Reception Facilities
..................................................................................................
74
4.6 Ventilated Washing System (P&A Standards Appendix C)
.........................................................................................
74
4.7 Segregated Ballast Tanks
............................................................................................................................................
74
Part 5
SHIPBOARD OIL POLLUTION EMERGENCY PLANS
Chapter 1
GENERAL
............................................................................................................................................................
76
1.1 General
........................................................................................................................................................................
76
Chapter 2
TECHNICAL REQUIREMENTS
......................................................................................................................
77
2.1 General
........................................................................................................................................................................
77
2.2 Entries in Shipboard Oil Pollution Emergency Plans
.................................................................................................
77
2.3 Appendices to Shipboard Oil Pollution Emergency Plans
..........................................................................................
78
2.4 Additional Requirements for Oil Tankers of 5,000 tonnes Deadweight and above
....................................................
78
Part 6
SHIPBOARD MARINE POLLUTION EMERGENCY PLAN FOR NOXIOUS
LIQUID SUBSTANCES
Chapter 1
GENERAL
............................................................................................................................................................
79
1.1 General
........................................................................................................................................................................
79
Chapter 2
TECHNICAL REQUIREMENTS
......................................................................................................................
80
2.1 General
........................................................................................................................................................................
80
2.2 Entries in Shipboard Marine Pollution Emergency Plan for Noxious Liquid Substances
..........................................
80
2.3 Appendices to Shipboard Marine Pollution Emergency Plan for Noxious Liquid
Substances
...................................................................................................................................................................
81
Part 7
EQUIPMENT FOR THE PREVENTION OF POLLUTION BY SEWAGE
Chapter 1
GENERAL
............................................................................................................................................................
82
1.1 General
........................................................................................................................................................................
82
Chapter 2
EQUIPMENT FOR THE PREVENTION OF POLLUTION BY SEWAGE
FROM SHIPS
.......................................................................................................................................................
84
2.1 General
........................................................................................................................................................................
84
2.2 Requirements for Installation of Equipment
...............................................................................................................
84
Part 8
EQUIPMENT FOR THE PREVENTION OF AIR POLLUTION FROM SHIPS
Chapter 1
GENERAL
............................................................................................................................................................
86
II
1.1 General
........................................................................................................................................................................
86
1.2 General Requirement
...................................................................................................................................................
89
Chapter 2
EQUIPMENT FOR THE PREVENTION OF AIR POLLUTION FROM SHIPS
........................................
91
2.1 Nitrogen Oxides (NOx) (Regulation13 of Annex VI)
.................................................................................................
91
2.2 Sulphur Oxides (SOx) and Particulate Matter (Regulation14 of Annex VI)
...............................................................
95
2.3 Vapour Collection System (Regulation15 of Annex VI)
.............................................................................................
96
2.4 Incinerator (Regulation16 of Annex VI)
......................................................................................................................
96
Chapter 3
ENERGY EFFICIENCY FOR SHIPS
...............................................................................................................
98
3.1 General
........................................................................................................................................................................
98
3.2 Attained Energy Efficiency Design Index (Attained EEDI) (Regulation 22 of Annex VI)
.......................................
100
3.3 Attained Energy Efficiency Existing Ship Index (Attained EEXI) (Regulation 23 of Annex VI)
.............................
100
3.4 Required Energy Efficiency Design Index (Required EEDI) (Regulation 24 of Annex VI)
......................................
100
3.5 Required Energy Efficiency Existing Ship Index (Required EEXI)
(Regulation 25 of Annex VI)
......................................................................................................................................
103
3.6 Ship Energy Efficiency Management Plan (SEEMP) (Regulation 26 of Annex VI)
.................................................
104
3.7 Statements of Compliance related to Fuel Oil Consumption Reporting and
Operational Carbon Intensity Rating to be kept
.........................................................................................................
105
3.8 Data Collection, Reporting and Retained related to Fuel Oil Consumption Reporting, etc.
(Regulations 27 of Annex VI)
.....................................................................................................................................
105
3.9 Operational Carbon Intensity (Regulations 28 of Annex VI)
.....................................................................................
106
Part 9
CONSTRUCTION AND EQUIPMENT FOR THE PREVENTION FROM SHIPS OPERATING
IN POLAR WATERS
Chapter 1
GENERAL
...........................................................................................................................................................
107
1.1 General
.......................................................................................................................................................................
107
1.2 Definitions
..................................................................................................................................................................
107
Chapter 2
PREVENTION OF POLLUTION BY OIL
......................................................................................................
108
2.1 Shipboard Oil Pollution Emergency Plan and Others
................................................................................................
108
2.2 Structural Requirements
.............................................................................................................................................
108
Chapter 3
PREVENTION OF POLLUTION BY NOXIOUS LIQUID SUBSTANCES
................................................
109
3.1 Shipboard Marine Pollution Emergency Plan and Others
.........................................................................................
109
3.2 Construction and Equipment
......................................................................................................................................
109
Appendix I
GUIDANCE FOR THE DISCHARGE OF NOXIOUS LIQUID SUBSTANCES,
ETC.
....................................................................................................................................................................
110
III
RULES FOR MARINE POLLUTION PREVENTION SYSTEMS
Part 1 GENERAL
Chapter 1 GENERAL
1.1 General
1.1.1 Application*
1 The Rules for Marine Pollution Prevention Systems (hereinafter referred to as “the Rules”) apply to the survey,
construction and equipment for the prevention of pollution from ships classed with NIPPON KAIJI KYOKAI
(hereinafter referred to as “the Society”) and intended to be registered as the Marine Pollution Prevention
Installations under Chapter 3 of the Regulations for the Classification and Registry of Ships.
The “Marine Pollution Prevention Installations” means the construction and equipment specified in Part 3, 4, 7
and 8 and include the emergency plans specified in Part 5 and 6.
2 Where there are special reasons for non-compliance with any requirements of the Rules, it may comply with
other requirements modified by the Society on the basis of the Rules.
3 The other equipment of ships for the prevention of pollution, which is not required to be installed by the Rules,
are to comply with as deemed appropriate by the Society.
4 The relevant requirements in the Rules for the Survey and Construction of Steel Ships apply to the materials,
equipment, installation and workmanship of the systems, unless otherwise specified in the Rules.
1.1.2 Equivalents (Regulation 5.1 of Annex I, Regulation 5.1 and 5.3 of Annex II)*
1 The Society may allow any fittings, materials, appliances or apparatus to be fitted in a ship as an alternative to
that required by the requirements of the Rules, where such fittings, materials, appliances or apparatus are at least as
effective as that required by the Rules. However, the authority of the Society is not to extend to substitution of
operational methods to effect the control of discharge of oil as equivalent to those design and construction features
which are prescribed by the Rules.
2 Notwithstanding the provisions in 1.1.2-1, the construction and equipment of liquefied gas carriers certified to
carry Noxious Liquid Substance listed in Table N19.1 in Part N of Rules for the Survey and Construction of Steel
Ships, shall be deemed to be equivalent to the construction and equipment requirements contained in 2.2.2, 4.3 and
4.4 of Part 4, provided that the gas carrier meets all follows condition:
(1) To be provided with compliance with the requirements of Part N of Rules for the Survey and Construction of
Steel Ships or the requirements separately provided by the Society;
(2) To be provided with compliance with the requirements of Part 4 except 2.2.2, 4.3 and 4.4 of Part 4 for liquefied
gas carriers to carry only Noxious Liquid Substance listed in Table N19.1 of Part N;
(3) To be provided with segregated ballast arrangements;
(4) To be provided with pumping and piping arrangements to ensure Capacity of stripping system in Table 4-3 of
Part 4;
(5) To be provided with a Manual for procedures and arrangements for discharge of noxious liquid substances,
ensuring that no operational mixing of cargo residues and water will occur and that no cargo residues will
remain in the tank after applying the ventilation procedures.
1.1.3 National Requirements
The Society may make special requirements as instructed by the flag-government of ships or the government of
sovereign nation in which ships navigate.
1
2023 Rules for Marine Pollution Prevention Systems (Part 1 Chapter 1)
1.1.4 Class Notations
1 Based on 2.1.3-2 of the Rules for the Classification and Registry of Ships, “Energy Efficiency Design
Index-phase X” (abbreviated as EEDI-pX in which X refers to the adopted phase) is to be affixed to the classification
characters of ships whose attained EEDI satisfies a required value calculated using a phase reduction factor which is
stricter than the phase reduction factor to be applied according to Chapter 3, Part 8; for ro-ro cargo ships and ro-ro
passenger ships, however, this requirement only applies in cases where the required EEDI value is stricter.
2 Based on 2.1.3-2 of the Rules for the Classification and Registry of Ships, “Nitrogen Oxides Emission-Tier III”
(abbreviated as “NOx-III”) is to be affixed to the classification characters of ships installed with diesel engines
satisfying the maximum allowable NOx emission limit criteria specified in 2.1.2-1(1)(c) of Part 8 which are
permitted to operate in NOx emission control areas. For ships using selective catalytic reduction systems, exhaust gas
recirculation systems, dual fuel engines or gas-only engines to satisfy the maximum allowable NOx emission limits
criteria specified in 2.1.2-1(1)(c), Part 8, the notations referred to in (1) to (4) below are listed in parentheses after
NOx-III according to the installed equipment/engine. The purposes of engines fitted with the systems referred to in
(1) and (2) below and the engines referred to in (3) and (4) below are to be entered in the Classification Register as
descriptive notes for the ship.
(1) Ships using selective catalytic reduction systems complying with Chapter 21, Part D of the Rules for the
Survey and Construction of Steel Ships:
Selective Catalytic Reduction (abbreviated as “SCR”)
(2) Ships using exhaust gas recirculation systems complying with Chapter 23, Part D of the Rules for the Survey
and Construction of Steel Ships:
Exhaust Gas Recirculation (abbreviated as “EGR”)
(3) Ships using dual fuel engines complying with 16.1 and 16.7, Part N of the Rules for the Survey and
Construction of Steel Ships or 1.1.3-1(20), Part GF of the Rules for the Survey and Construction of Steel
Ships:
Dual Fuel Engine (abbreviated as “DFE”)
(4) Ships using gas-only engines complying with 1.1.3-1(20), Part GF of the Rules for the Survey and
Construction of Steel Ships:
Gas-only Engine (abbreviated as “GOE”)
3 With regard to the permission/prohibition of operation of diesel engines in the NOx emission control areas
referred to in 1.1.2(15), Pat 8 of the Rules, excluding those case where exemption from compliance with the
standards specified in Regulation 13.5.1 of Annex VI is granted, the following (1) and (2) are to be entered into the
Classification Register as descriptive notes for the ship.
(1) In the case where diesel engine installations are provided on ships at beginning stage of construction on or after
1 January 2016 (excluding those which fall under the following (2)) in accordance with the requirements of
Annex VI, a note thereof (e.g., NOx-III(2016)) is to be added.
(2) In the case where diesel engine installations are provided on ships at beginning stage of construction on or
after 1 January 2021 in accordance with the requirements of Annex VI, a note thereof (e.g., NOx-III(2021)) is
to be added.
4 Based on 2.1.3-2 of the Rules for the Classification and Registry of Ships, “Sulphur Oxides” (abbreviated as
“SOx”) is to be affixed to the classification characters of ships provided with the following (1) and/or (2) that comply
with the requirements related to sulphur content specified in -1 or -2 of 1.2.2-1, Part 8, or that are compliance
methods at least equivalent to those complying with such requirements. The notations referred to in (1) and (2) below
are listed in parentheses after SOx according to the provided arrangement/system. Details of the fuel referred to in (1)
below as well as the purposes of machinery using the fuel referred to in (1) below and machinery fitted with the
systems referred to in (2) below are to be entered in the Classification Register as descriptive notes for the ship.
(1) Arrangements for using the low-flashpoint fuel referred to in 2.2.1-28, Part GF of the Rules for the Survey
and Construction of Steel Ships that comply with Chapter 16, Part N of the Rules for the Survey and
Construction of Steel Ships or comply with Part GF of the Rules for the Survey and Construction of Steel
Ships:
“Low-Flashpoint Fuel” (abbreviated as “LFF”)
(2) Exhaust gas cleaning systems approved by the Administration as an alternative specified in 1.1.3, Part 8 that
comply with Chapter 22, Part D of the Rules for the Survey and Construction of Steel Ships:
2
2023 Rules for Marine Pollution Prevention Systems (Part 1 Chapter 1)
剩余282页未读,继续阅读
资源评论
phyit
- 粉丝: 7657
- 资源: 2803
下载权益
C知道特权
VIP文章
课程特权
开通VIP
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功