PDU8000 Power Distribution Room PDC-T
Quick Guide
PDU8000 配电间配电柜-T
快速指南
Issue: 01
文档版本:01
PDC Code: 02405478
配电柜编码:02405478
Date: 2019-7-25
发布日期:2019-7-25
The following figure shows the model naming conventions for a UPS PDC.
UPS配电柜的设备型号说明如下所示:
To ensure safety of humans and the equipment, pay attention to the safety symbols on the equipment and all the safety
instructions in this document. The "NOTE", "CAUTION", and "WARNING" marks in this document do not represent all
the safety instructions. They are only supplements to the safety instructions. When operating Huawei equipment, in
addition to following the general precautions in this document, follow the specific safety instructions given by Huawei.
Huawei will not be liable for any consequences that are caused by the violation of safety regulations and design,
production, and usage standards.
为保障人身和设备安全,在安装、操作、维护设备时,请遵循设备上标识及手册中说明的所有安全注意事项。手册中的
“安全警告”、“注意”、“说明”事项,并不代表所应遵守的所有安全事项,只作为所有安全注意事项的补充。在进行
本公司产品、设备的各项操作时,必须严格遵守由华为公司提供的相关设备注意事项和特殊安全指示。手册中列出的“安
全警告”仅代表了华为公司知道的部分,华为公司不承担任何因违反通用安全操作要求或违反设计、生产和使用设备安全
标准而造成损失的责任。
Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved
.
版权所有 © 华为技术有限公司2019。保留一切权利。
When operating the equipment, you must follow the local laws and regulations.
操作设备时,应遵守当地法规和规范。
Only trained and qualified personnel are allowed to install, operate, and maintain Huawei equipment.
负责安装维护华为设备的人员,必须先经严格培训,掌握正确的操作方法及安全注意事项后,方可安装、操作和维护设备。
Before installation, get familiar with the following documents:
安装开始前,确保已经学习并掌握了除本文档以外的以下文档信息:
Parts documents.
随货的其它部件资料。
To ensure human safety, connect the ground cable first when connecting cables.
配电柜接线时,需按照本指南指导的接线顺序,首先安装地线以确保人身安全。
Only trained and qualified personnel are allowed to install, operate, and maintain Huawei equipment, and they must
understand basic safety precautions to avoid hazards.
系统接线的操作人员必须具备基本的安全操作知识,需经过培训,掌握正确的操作方法,并具有相应作业资格。
To prevent electric shocks, get tools insulated and wear electrostatic discharge (ESD) gloves when connecting cables.
进行接线操作时,操作人员需对工具进行绝缘处理,佩戴绝缘手套,避免触电。
After the installation and commissioning, do not open the rear door or side panel. Otherwise, electric shocks may occur.
安装调测完成后,请勿擅自打开后门和侧板,否则会有触电的危险。
1
PDU8000–XXXX AC XX UC XXXX
UPS power distribution cabinet / UPS配电柜
V4: Rated 380 V to 415 V / V4: 额定380V~415V
V5: Rated 480 V / V5: 额定480V
V7: Rated 200 V to 220 V / V7: 额定200V~220V
AC power supply / 交流电
Power distribution capacity / 配电容量
Power distribution cabinet / 配电柜
Serial number / 流水码
Data center power distribution product / 数据中心配电产品
1
Precautions / 安全注意事项
Safety Precautions / 遵守所有安全注意事项
1.1
Local Safety Regulations / 遵守当地法规和规范
1.2
Personnel Requirements / 人员要求
1.3
Human Safety / 人身安全
1.4
2
Model Description / 设备型号说明
Cabinet dimensions (H x W x D): 2000 mm x 800 mm x 600 mm
机柜尺寸(高×宽×深):2000mm×800mm×600mm
NOTE / 说明
3
2
Measuring tape
卷尺
Adjustable wrench
活动扳手
Electroprobe
电笔
Level
水平尺
Claw hammer
羊角锤
Diagonal pliers
斜口钳
Crimping tool
压线钳
Wire stripper
剥线钳
Protective gloves
防护手套
Socket wrench set
套筒扳手
Heat gun
热风枪
Electrician's knife
电工刀
Hydraulic pliers
液压钳
Insulated gloves
绝缘手套
Step ladder (2 m)
人字梯(2m)
Short-handle Phillips
screwdriver (85 mm)
短柄十字螺丝刀(85mm)
Phillips/Flat-head
screwdriver
十字 / 一字螺丝刀
Hammer drill
冲击钻
Automatic transfer
switch (ATS)
自动转换开关
Open the packing case, and check that all components listed in the packing list are intact. Ensure that all components
are available before cleaning up the package materials. If components or fittings are damaged during transportation or
do not comply with the order contract, make records onsite and contact the local Huawei regional office or
representative office immediately.
打开包装箱,根据装箱清单检查设备的配件是否齐全、是否在运输过程中损坏。清除包装材料之前,要确保所有配件都已
找到。如设备和配件在运输中损坏或与订货合同不符,应及时现场记录,并与华为公司当地分公司或办事处代表联系。
Front view of the UPS PDC / UPS配电柜前视图
Do not replace original components of the product during installation without authorization. If the replacement is
required, contact Huawei engineers.
安装过程中,产品出厂原配部件不能擅自更换,如需更换,请联系华为工程师。
3
Tools / 安装工具
4
UPS PDC Layout / 结构示意图
5
Installing an UPS PDC / 安装UPS配电柜
Checking Before Installation / 安装前检查
5.1
Installing the Cabinet / 安装配电柜
5.2
Surge protective device (SPD)
and SPD circuit breakers
防雷器及防雷空开
1. Move the cabinet from the wood pallet to the ground.
将机柜从木栈板移动至地面。
2. Plan the cabinet installation position based on the following figure.
参考下图规划机柜安装位置。
NOTE / 说明
5. Insert bolts into the mounting holes and partially tighten the bolts.
将螺栓插入安装孔并预紧固。
4. Align the cabinet with mounting holes, and use a level to level the cabinet by adjusting the leveling feet.
将机柜对齐安装孔,配合水平尺调节地脚螺栓使机柜水平。
3. Drill holes using a hammer drill and install expansion bolts.
用冲击钻钻孔并安装膨胀螺栓。
1. Wrench a leveling foot clockwise to elevate the cabinet, or wrench it counterclockwise to lower the cabinet. The
adjustable height ranges from 0 mm to 8 mm.
顺时针方向将机柜调高,逆时针方向调低。地脚调节范围:0mm~8mm。
2. Adjust four leveling feet to avoid damage to the cabinet. Adjusting only one leveling foot may cause the cabinet to tilt.
机柜调平过程中,不要只调节一方地脚的高度,尽量四方地脚协调调节,以免机柜倾斜造成机柜损坏。
6. Tighten the bolts in diagonal order.
按对角线顺序交叉紧固螺栓。
If the cabinet is installed on a support, skip
steps 2 and 3.
如果机柜安装在支架上,步骤2、3可省略。
NOTE / 说明
NOTE / 说明
The following table lists the tightening
torque of different bolts.
各螺栓紧固扭矩说明如下表所示。
Unit: mm
单位:mm
Bottom view of the UPS PDC / UPS配电柜底部视图
Bolts /
螺栓
Recommended Torque
/ 推荐扭矩 (N·m)
M8 13
M10 27
M12 47
M16 120
7. Install the sealing plate.
安装封板。
Output circuit breaker
输出空开
Auxiliary power for electric
operating machanism
交流接触器空开
Terminal blocks
端子排