没有合适的资源?快使用搜索试试~ 我知道了~
AFF A800 - Replacing a PCIe card.pdf
需积分: 9 0 下载量 71 浏览量
2021-09-23
10:53:47
上传
评论
收藏 1.23MB PDF 举报
温馨提示
试读
11页
AFF A800 - Replacing a PCIe card.pdf
资源推荐
资源详情
资源评论
AFF A800 systems
Replacing a PCIe card
To replace a PCIe card, you must disconnect the cables from the cards, remove the SFP and QSFP modules from the cards
before removing the riser, reinstall the riser, and then reinstall the SFP and QSFP modules before cabling the cards.
About this task
• You can use this procedure with all versions of ONTAP supported by your system
• All other components in the system must be functioning properly; if not, you must contact technical support.
Steps
1. Shutting down the impaired controller on page 1
2. Removing the controller module on page 3
3. Replacing a PCIe card on page 5
4. Reinstalling the controller module on page 8
5. Switching back aggregates in a two-node MetroCluster configuration on page 9
6. Completing the replacement process on page 10
Shutting down the impaired controller
You can shut down or take over the impaired controller using different procedures, depending on the storage system hardware
configuration.
Shutting down the impaired node
To shut down the impaired node, you must determine the status of the node and, if necessary, take over the node so that the
healthy node continues to serve data from the impaired node storage.
Before you begin
• If you have a cluster with more than two nodes, it must be in quorum. If the cluster is not in quorum or a healthy node shows
false for eligibility and health, you must correct the issue before shutting down the impaired node.
ONTAP 9 System Administration Reference
Steps
1. If the impaired node is part of an HA pair, disable automatic giveback from the console of the healthy node:
storage failover modify -node local -auto-giveback false
2. Take the impaired node to the LOADER prompt:
If the impaired node is displaying... Then...
The LOADER prompt Go to the next step.
Waiting for giveback... Press Ctrl-C, and then respond y.
1
215-12554_2019-11_en-us November 2019 Copyright
©
2019 NetApp, Inc. All rights reserved.
Web: www.netapp.com • Feedback: [email protected]
If the impaired node is displaying... Then...
System prompt or password prompt
(enter system password)
Take over or halt the impaired node:
storage failover takeover -ofnode impaired_node_name
When the impaired node shows Waiting for giveback..., press Ctrl-C, and then
respond y.
Shutting down a node in a two-node MetroCluster configuration
To shut down the impaired node, you must determine the status of the node and, if necessary, switch over the node so that the
healthy node continues to serve data from the impaired node storage.
About this task
You must leave the power supplies turned on at the end of this procedure to provide power to the healthy node.
Steps
1.
Check the MetroCluster status to determine whether the impaired node has automatically switched over to the healthy node:
metrocluster show
2. Depending on whether an automatic switchover has occurred, proceed according to the following table:
If the impaired node... Then...
Has automatically switched over Proceed to the next step.
Has not automatically switched over Perform a planned switchover operation from the healthy node:
metrocluster switchover
Has not automatically switched over,
you attempted switchover with the
metrocluster switchover
command, and the switchover was
vetoed
Review the veto messages and, if possible, resolve the issue and try again. If you are unable to
resolve the issue, contact technical support.
3. Resynchronize the data aggregates by running the metrocluster heal -phase aggregates command from the
surviving cluster.
Example
controller_A_1::> metrocluster heal -phase aggregates
[Job 130] Job succeeded: Heal Aggregates is successful.
If the healing is vetoed, you have the option of reissuing the metrocluster heal command with the -override-vetoes
parameter. If you use this optional parameter, the system overrides any soft vetoes that prevent the healing operation.
4. Verify that the operation has been completed by using the metrocluster operation show command.
Example
controller_A_1::> metrocluster operation show
Operation: heal-aggregates
State: successful
Start Time: 7/25/2016 18:45:55
End Time: 7/25/2016 18:45:56
Errors: -
2
AFF A800 systems: Replacing a PCIe card
5. Check the state of the aggregates by using the storage aggregate show command.
Example
controller_A_1::> storage aggregate show
Aggregate Size Available Used% State #Vols Nodes RAID Status
--------- -------- --------- ----- ------- ------ ---------------- ------------
...
aggr_b2 227.1GB 227.1GB 0% online 0 mcc1-a2 raid_dp, mirrored,
normal...
6. Heal the root aggregates by using the metrocluster heal -phase root-aggregates command.
Example
mcc1A::> metrocluster heal -phase root-aggregates
[Job 137] Job succeeded: Heal Root Aggregates is successful
If the healing is vetoed, you have the option of reissuing the metrocluster heal command with the -override-vetoes
parameter. If you use this optional parameter, the system overrides any soft vetoes that prevent the healing operation.
7.
Verify that the heal operation is complete by using the metrocluster operation show command on the destination
cluster:
Example
mcc1A::> metrocluster operation show
Operation: heal-root-aggregates
State: successful
Start Time: 7/29/2016 20:54:41
End Time: 7/29/2016 20:54:42
Errors: -
8. On the impaired controller module, disconnect the power supplies.
Removing the controller module
You must remove the controller module from the chassis when you replace the controller module or replace a component inside
the controller module.
Steps
1. If you are not already grounded, properly ground yourself.
2. Unplug the controller module power supplies from the source.
3. Release the power cable retainers, and then unplug the cables from the power supplies.
4. Loosen the hook and loop strap binding the cables to the cable management device, and then unplug the system cables and
SFP and QSFP modules (if needed) from the controller module, keeping track of where the cables were connected.
Leave the cables in the cable management device so that when you reinstall the cable management device, the cables are
organized.
5. Remove the cable management device from the controller module and set it aside.
6. Press down on both of the locking latches, and then rotate both latches downward at the same time.
Removing the controller module
3
剩余10页未读,继续阅读
资源评论
黑山老腰断了
- 粉丝: 5
- 资源: 427
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功