Specified herein. Unless otherwise indicated, the documents
is of the
Issue if effect on the date of invitation to bid or request
for proposal.
2.2.優先順序: ORDER OF PRECED
本文若與其製程管制項目相牴觸,則以製程管制項目為優先.
In the event of a conflict between this document and the
manufacturing
process Details, The manufacturing process details shall
take precedence.
本文若與其製程管制項目相牴觸,則以製程管制項目為優先.
In the event of a conflict between this document, reference
documents and
piece Part drawings, the piece part drawings will take
precedence.
3.檢視方法: INSPECTION METHOD
3.1.目視檢測: 依下列規定檢測.
VISUAL INSPECTION
Inspection shall be conducted as follows.
3.1.1.照明:目視檢測以工廠常態照明(100±20 呎燭光之冷白螢照明