Test Summary Report
for
Project
DATE
1.0 Identification
OUR PROJECT .
2.0 Description of Test Environment
A single database test environment was used to test the Our project. The database was configured similar
to the clients own set up. The database was set on a HPUX server running 10.10 operating system. The
version of Oracle was 7.2.2.3.0.
The configuration of the client workstations was 100MHz Pentium and 32 MB of RAM running the NT 4.0
and windows 95 operating system.
The Our process was set up on NT 4.0 desktop operating system with 100MHz processor and 32 MB of
RAM.
3.0 Test Strategy
• A test summary was developed for the Cross functional team to review the test strategy.
• A test plan was developed to specifically identify and describe how the tests cases were to be executed.
• The automation tool SQA Robot version 6.0 was used for boundary testing.
• The testing mainly focused on the Our Projects process it self not the client, however QA did note and
log numerous client issues.
• Install testing was done from the diskette to the NT machine.
4.0 Summary
The testing of the Our Project took 25 days. There were three separate builds done after the code
was first sent to QA. The first build was due to issue 4483, the fact that when the process encountered a
record too big for the file it aborted the process. It was decided by product development to change the
value to 9999999999 in the detail section if it goes over 10 digits. If the total exceeds 10 digits, then the total
figure would be filled with 9999999999 and Arbor will reject the file.
The second build resulted when the imported the files into a system and the files did not work. The
reason was because the information communicated to our company from the other company was not
complete. The incorrect information was;
1. The name of the Our file was incorrect.
2. The total count in the last trailer record must include all lines in the file.
3. The detail records "check column" needed to be a "payment total" not the "check total".
The third build resulted because the name of the imported file was still incorrect. The original
document required the Our file to have the extension .dat, however Arbor could not process the file with
this extension.
It was decided after the third round of testing that QA would do installation testing. The
documented installation test was delayed due to the fact that development did not have an installation kit
made. QA had to reject the first kit made because a critical SQL script was missing and another SQL script