安全分析模型 HEAVENS
安全分析模型 HEAVENS。 This deliverable (D2 Security models, Release 2, Version 2.0) presents the results and achievements of work package WP2 (Security models) of the HEAVENS project.
安全分析模型 HEAVENS。 This deliverable (D2 Security models, Release 2, Version 2.0) presents the results and achievements of work package WP2 (Security models) of the HEAVENS project.
ISO 21434扫描OCR文字版。 This document specifies requirements for cybersecurity risk management regarding engineering for concept, development, production, operation, maintenance, and decommissioning for road vehicle electrical and electronic (E/E) systems, including their components and interfaces.
This Standard has two intended functions. Firstly, it seeks to provide a comprehensive, authoritative definition of the Goal Structuring Notation (GSN). Secondly, it aims to provide clear guidance on current best practice in the use of the notation for those concerned with the development and evaluation of engineering arguments – argument owners, readers, authors and approvers. The Standard was developed by means of a consensus process involving GSN users from both academia and industry, between 2007 and 2011. The document history on page iii outlines the recent history of the collaboration, and a list of contributors to the Standard is provided on page iv.
Rolling Wave Project Planning (RWPP) is a phased iterative approach to project development, applicable to new product development, information systems and other technical development environments. It is an excellent formal project development approach for inventive work. When done well, it balances structured process with flexibility. It is appropriate for project life cycle models/methods that allow incremental development (spiral, evolutionary prototyping, etc.).
The work breakdown structure (WBS) is an effective tool in managing NASA programs and projects. It assists both NASA and contractors in fulfilling management responsibilities. In accordance with NASA Handbook 7120.5, Management of Major System Programs and Projects, a WBS is mandatory for major system acquisitions and major projects, and will be used for other projects when practical. A WBS is required when performance measurement is applied to a contract.
Practice Standard for Work Breakdown Structure_SecondEdition
笔耕不辍
持续创作
分享精英
创作能手
分享达人