没有合适的资源?快使用搜索试试~ 我知道了~
rfc 4 真是的,竟然有长度限制
需积分: 9 1 下载量 149 浏览量
2011-03-19
16:39:58
上传
评论
收藏 6KB TXT 举报
温馨提示
试读
11页
rfc 4 真是的,竟然有长度限制 rfc 4 真是的,竟然有长度限制
资源推荐
资源详情
资源评论
Network Working Group Elmer B. Shapiro
Request for Comment: 4 Stanford Research Institute
Category: Informational 24 March 1969
Network Timetable
1 (n10) network checkout
2 Installation of communcation gear 8/1/69
2a From AT&T and/or BBN need dimensional, power and cabling
specifications
2b Need to establish SRI desired alternate locations so as to
determine maximum telco cable lengths
2c Need to establish location and drops on voice coordination
circuits
2d Need circuit information on voice drops for tie to intercom
system
2e Need to order and install a.c. power (coordinate with 4b)
2f See 16
3 Design and construct host-Imp interface 9/1/69
3a Need specifications from BBN
3b Develop trial design
3c Review with system programmers
3d Establish final design
3e Build and design hardware
3f Debug trial software with hardware loop test
4 Imp installation 9/15/69
4a from BBN get dimensional, power and cabling specifications
4b SRI orders and installs a.c. power (coordinate with 2e)
[Page 1]
5 Debug host-Imp interface 10/1/69
2f See 16
3 Design and construct host-Imp interface 9/1/69
3a Need specifications from BBN
3b Develop trial design
3c Review with system programmers
3d Establish final design
3e Build and design hardware
3f Debug trial software with hardware loop test
4 Imp installation 9/15/69
4a from BBN get dimensional, power and cabling specifications
4b SRI orders and installs a.c. power (coordinate with 2e)
[Page 1]
5 Debug host-Imp interface 10/1/69
剩余10页未读,继续阅读
资源评论
小柔柔
- 粉丝: 4
- 资源: 6
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功