没有合适的资源?快使用搜索试试~ 我知道了~
Allegro后处理流程规范
资源推荐
资源详情
资源评论
Productivity Toolbox User Guide
Post Processing
February 2017
Post Processing
Table of Contents
1 Overview .............................................................................................................................. 1
2 Use model ............................................................................................................................ 2
2.1 Launching the utility....................................................................................................... 2
2.2 Use model ..................................................................................................................... 3
2.3 Task editing ................................................................................................................... 4
3 Task description ................................................................................................................... 7
3.1 Update shape ................................................................................................................ 7
3.2 Cross Section Generator ............................................................................................... 7
3.3 Clean Data .................................................................................................................... 7
3.4 Standard BOM .............................................................................................................. 8
3.5 Variant BOM ................................................................................................................. 9
3.6 Variant Assembly ........................................................................................................ 10
3.7 NC drill legend ............................................................................................................. 11
3.8 NC Drill data ................................................................................................................ 11
3.9 NC Route data ............................................................................................................ 11
3.10 Artwork data ................................................................................................................ 11
3.11 Standard Plot .............................................................................................................. 11
3.12 Batch Plot .................................................................................................................... 12
3.13 Mfg Collector ............................................................................................................... 12
3.14 Zip Data ...................................................................................................................... 13
Table of Figures
Figure 1: Post Processing ........................................................................................................... 1
Figure 2: Post Processing form ................................................................................................... 2
Figure 3: Task editing using context menu .................................................................................. 4
Figure 4: Adding a user task ........................................................................................................ 5
Figure 5: User task display in tree view ....................................................................................... 5
Figure 6: Adding a predefined task .............................................................................................. 6
Figure 7: Clean Data task argument ............................................................................................ 7
Figure 8: Clean Data multiple task arguments ............................................................................. 8
Figure 9: Standard BOM report formatted text ............................................................................. 8
Figure 10: Standard BOM report CSV format .............................................................................. 9
Figure 11: Variant BOM task argument ..................................................................................... 10
Figure 12: Variant Assembly task argument .............................................................................. 11
Figure 13: Batch Plot task argument.......................................................................................... 12
Figure 14: Zip Data task arguments........................................................................................... 13
Figure 15: Zip Data multiple task arguments ............................................................................. 13
Post Processing
Page 1/13
1 Overview
Once the schematic design and the PCB layout has been finished manufacturing data has to be
generated. The amount and type of data to be generated differs significantly from one customer
to another as not only drill and Gerber have to be generated but also various assembly
drawings. The process of generating the manufacturing output usually takes a lot of time
especially in the redesign process.
Post Processing is an application which acts as central cockpit from which manufacturing
output tasks can be configured. Once configured the user only needs to “hit the button” so that
manufacturing data will be generated in background. All information is stored in the database. If
necessary the configuration can be saved to disk and loaded into another design.
Post Processing distinguishes between tasks and jobs:
A task represents a function from PCB Editor which generates data. A task can be a
standard function from PCB Editor (e.g. Artwork generation, NC drill generation), a user
defined macro or any other skill application (e.g. Batch Plot).
A job represents a collection of tasks which are executed sequentially. For some
reasons user might want to generate different data depending on the manufacturer
chosen. Instead of enabling or disabling individual tasks, the user simply defines a new
job with the corresponding tasks enabled. When generating data the user only needs to
select the job and start the process.
Figure 1: Post Processing
剩余14页未读,继续阅读
资源评论
不觉明了
- 粉丝: 3099
- 资源: 5313
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功