一类具有特殊阻塞约束的两阶段流水车间成组调度模型与算法
袁帅鹏, 李铁克, 王柏琳, 余娜娜
引用本文:
袁帅鹏, 李铁克, 王柏琳, 等. 一类具有特殊阻塞约束的两阶段流水车间成组调度模型与算法[J]. 控制与决策, 2020, 35(7):
1773-1779.
在线阅读 View online: https://doi.org/10.13195/j.kzyjc.2018.1533
您可能感兴趣的其他文章
Articles you may be interested in
考虑模糊作业时间的再制造加工车间多目标调度方法
Multi-objective optimization method of remanufacturing reprocessing shop scheduling with fuzzy processing time
控制与决策. 2020, 35(6): 1497-1504 https://doi.org/10.13195/j.kzyjc.2018.1187
工件可拒绝的有限等待置换流水车间调度算法
Scheduling algorithm for permutation flowshop with limited waiting times and rejection
控制与决策. 2019, 34(3): 459-469 https://doi.org/10.13195/j.kzyjc.2017.1127
基于总加权完成时间的可重入混合流水车间调度问题
Reentrant hybrid flowshop scheduling problem based on total weighted completion time
控制与决策. 2018, 33(12): 2218-2226 https://doi.org/10.13195/j.kzyjc.2017.0907
传搁时间约束下的运输与批处理机生产协调调度
Coordinated scheduling of transportation and production on batching-machine with tracking time constraint
控制与决策. 2017, 32(6): 995-1000 https://doi.org/10.13195/j.kzyjc.2016.0489
期望-风险准则多阶段流水车间鲁棒调度
Robust scheduling of multi-stage flow shop under machine breakdowns following expect-risk rule
控制与决策. 2016, 31(6): 1087-1092 https://doi.org/10.13195/j.kzyjc.2015.0568
评论0
最新资源