Cisco ASR 9000 Series
Aggregation Services Router,
Release 4.3.4
Upgrade and Downgrade Procedure
February, 2010
Upgrade and Downgrade Procedure
© 2012 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 2 of 13
Contents
1. Introduction ............................................................................................................................................................. 3!
1.1 Purpose, Audience and Scope ..................................................................................................................... 3!
1.2 Important Notes ............................................................................................................................................. 3!
1.3 Summary of Upgrade Steps .......................................................................................................................... 3!
1.4 Cisco Software Manager ............................................................................................................................... 4!
2. Verifications Before Upgrading ............................................................................................................................... 4!
3. Mandatory SMUs (Upgrade and Downgrade) ........................................................................................................ 6!
3.1 Guidelines for Repartitioning Tool SMU .......................................................................................................... 7!
4. Selection of Packages for Upgrade ........................................................................................................................ 7!
5. Upgrade to IOS XR Release 4.3.4 .......................................................................................................................... 8!
6.#Turboboot#Option#for#Upgrades ................................................................................................................................ 9!
7.#Verify#Post9Upgrade#or#Downgrade .......................................................................................................................... 9!
8. Release 4.3.4 FPD Upgrade ................................................................................................................................. 10!
9. Downgrade from IOS XR Release 4.3.4 ............................................................................................................... 11!
10. ISSU SMU Upgrade in IOS XR Release 4.3.4 ................................................................................................... 11!
11. Caveats ............................................................................................................................................................... 12!
© 2012 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 3 of 13
1. Introduction
1.1 Purpose, Audience and Scope
The purpose of this document is to describe the upgrade and downgrade procedure for the Cisco ASR 9000 Series
Aggregation Services Router, Release 4.3.4.
Audience: This guide is for Cisco Systems Field Engineers and Network Operators.
1.2 Important Notes
1. From R4.3.0 onwards, a single combo image is introduced to support x86 (-px- image) and ppc (-p- image)
hardware architectures. The combo image will still be called asr9k-mini-px.vm. The optional pies - mpls,
mcast, mgbl, FPD, etc. and SMUs will have the -px- suffix.
2. Turboboot with format is needed to downgrade from 4.3.4-px to any pre-4.3.0 images (Refer to Section 9).
3. FPD pie is not included in the combo image, it must be installed separately to complete manual firmware
upgrade. Users upgrading from –p- to R4.3.4 –px- image must add fpd pie explicitly to complete the manual
firmware upgrade.
4. Lawful Intercept (LI) pie is needed to activate any LI functionality.
5. BNG pie is needed to activate any BNG functionality.
6. Services pie is needed to activate any CGN functionality.
7. The CGv6 install kit of the 4.3.4 release must be downloaded onto the ISM Line Card prior to upgrading the
XR image. Add the following steps if required :
Copy the install kit to disk0:
In admin mode, download CGv6 install-image ((admin) #download install-image disk0: install kit) to ISM
location Verify the card comes up and shows "APP-READY"
Also verify "show platform summary location ISM location". The application in this output should show 4.3.4
application
8. In R4.3.1 (or later) ASR-903 satellite is not supported on RSP2. Hence, asr9k-asr903-nV-px.pie should not be
installed on a RSP2 system.
1.3 Summary of Upgrade Steps
1. Download the correct image tarball from http://www.cisco.com to a tftpserver. The image tarball on
http://www.cisco.com cannot be used as-is. The CCO image tarball for Release 4.3.4 must be downloaded to
a tftpserver and only relevant packages or SMUs must be taken and tarred into another tarball for use on the
router.
2. Install add/activate all the mandatory SMUs required to be active in the current release before upgrading to
Release 4.3.4. Refer to the Section "Mandatory SMUs (Upgrade and Downgrade)" for a list of SMUs to be
used. The mandatory SMUs are available in the downloaded tar file.
剩余12页未读,继续阅读
资源评论
jingdeming
- 粉丝: 2
- 资源: 16
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
最新资源
- 基于JavaScript 实现的KMP 算法
- 基于C++实现二叉树的创建,遍历,添加,查找与删除
- 基于C语言实现二叉树的基本操作
- 毕业设计基于STM32的测量温度与压力的数据处理设计C语言完整源码+论文.zip
- 基于MATLAB的PCA算法人脸识别项目源码+GUI界面+说明文档.zip
- 基于STM32的测量温度与压力的数据处理设计源码+论文(毕业设计).zip
- Vision Transformer 网络对不同氨气氧气浓度轨迹RAS 图像数据集的分类,包含训练权重和数据集、迁移学习
- 基于C51带字库LCD12864(ST7920)的keil工程源码,只支持8位并口通讯(不支持串口),可显示中文.zip
- 基于SI4463射频模块433MD-SMA无线模块软硬件技术资料及(SI4463)IC技术资料文档.zip
- (GPS+北斗+GSM)HLK-GS2503模块软硬件开发资料包硬件参考设计(原理图PCB)+技术文档资料.zip
资源上传下载、课程学习等过程中有任何疑问或建议,欢迎提出宝贵意见哦~我们会及时处理!
点击此处反馈
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功