没有合适的资源?快使用搜索试试~ 我知道了~
资源推荐
资源详情
资源评论
AZ-120
Migrate SAP Workloads to Azure
Testlet 1
Case Study
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there
may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam
in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and
other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this
case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section
of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the
questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All
Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question,
click the Question button to return to the question.
Overview
Litware, Inc. is an international manufacturing company that has 3,000 employees.
Litware has two main offices. The offices are located in Miami, FL, and Madrid, Spain.
Existing Environment
Infrastructure
Litware currently uses a third-party provider to host a datacenter in Miami and a disaster recovery datacenter in Chicago, IL.
The network contains an Active Directory domain named litware.com. Litware has two third-party applications hosted in Azure.
Litware already implemented a site-to-site VPN connection between the on-premises network and Azure.
SAP Environment
Litware currently runs the following SAP products:
Enhancement Pack6 for SAP ERP Central Component 6.0 (SAP ECC 6.0)
SAP Extended Warehouse Management (SAP EWM)
SAP Supply Chain Management (SAP SCM)
SAP NetWeaver Process Integration (PI)
SAP Business Warehouse (SAP BW)
SAP Solution Manager
All servers run on the Windows Server platform. All databases use Microsoft SQL Server. Currently, you have 20 production servers.
You have 30 non-production servers including five testing servers, five development servers, five quality assurance (QA) servers, and 15 pre-production servers.
Currently, all SAP applications are in the litware.com domain.
Problem Statements
The current version of SAP ECC has a transaction that, when run in batches overnight, takes eight hours to complete. You confirm that upgrading to SAP Business
Suite on HANA will improve performance because of code changes and the SAP HANA database platform.
Litware is dissatisfied with the performance of its current hosted infrastructure vendor. Litware experienced several hardware failures and the vendor struggled to
adequately support its 24/7 business operations.
Requirements
Business Goals
Litware identifies the following business goals:
Increase the performance of SAP ECC applications by moving to SAP HANA. All other SAP databases will remain on SQL Server.
Move away from the current infrastructure vendor to increase the stability and availability of the SAP services.
Use the new Environment, Health and Safety (EH&S) in Recipe Management function.
Ensure that any migration activities can be completed within a 48-hour period during a weekend.
Planned Changes
Litware identifies the following planned changes:
Migrate SAP to Azure.
Upgrade and migrate SAP ECC to SAP Business Suite on HANA Enhancement Pack 8.
Technical Requirements
Litware identifies the following technical requirements:
Implement automated backups.
Support load testing during the migration.
Identify opportunities to reduce costs during the migration.
Continue to use the litware.com domain for all SAP landscapes.
Ensure that all SAP applications and databases are highly available.
Establish an automated monitoring solution to avoid unplanned outages.
Remove all SAP components from the on-premises network once the migration is complete.
Minimize the purchase of additional SAP licenses. SAP HANA licenses were already purchased.
Ensure that SAP can provide technical support for all the SAP landscapes deployed to Azure.
QUESTION 1
You are evaluating which migration method Litware can implement based on the current environment and the business goals.
Which migration method will cause the least amount of downtime?
A. Migrate SAP ECC to SAP Business Suite in HANA, and then migrate SAP to Azure.
B. Use Near-Zero Downtime (NZDT) to migrate to SAP HANA and Azure during the same maintenance window.
C. Use the Database Migration Option (DMO) to migrate to SAP HANA and Azure during the same maintenance window.
D. Migrate SAP to Azure, and then migrate SAP ECC to SAP Business Suite on HANA.
Correct Answer: C
Section: (none)
Explanation
Explanation/Reference:
Explanation:
The SAP Database Migration Option (DMO) with System Move option of SUM, used as part of the migration allows customer the options to perform the migration
in a single step, from source system on-premises, or to the target system residing in Microsoft Azure, minimizing overall downtime.
Reference:
https://blogs.sap.com/2017/10/05/your-sap-on-azure-part-2-dmo-with-system-move/
Migrate SAP Workloads to Azure
Testlet 2
Case Study
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there
may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam
in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and
other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this
case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section
of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the
questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All
Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question,
click the Question button to return to the question.
Overview
Contoso, Ltd. is a manufacturing company that has 15,000 employees.
The company uses SAP for sales and manufacturing.
Contoso has sales offices in New York and London and manufacturing facilities in Boston and Seattle.
Existing Environment
Active Directory
The network contains an on-premises Active Directory domain named ad.contoso.com. User email addresses use a domain name of contoso.com.
SAP Environment
The current SAP environment contains the following components:
SAP Solution Manager
剩余51页未读,继续阅读
资源评论
- weixin_569781122021-05-21用户下载后在一定时间内未进行评价,系统默认好评。
- weixin_510416752021-09-16用户下载后在一定时间内未进行评价,系统默认好评。
- u0103128882021-07-03用户下载后在一定时间内未进行评价,系统默认好评。
- d3xping2021-06-23用户下载后在一定时间内未进行评价,系统默认好评。
xueyunshengling
- 粉丝: 166
- 资源: 441
下载权益
C知道特权
VIP文章
课程特权
开通VIP
上传资源 快速赚钱
- 我的内容管理 展开
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功